BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Downey, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

A. The work includes furnishing all labor, materials, tools, equipment, and incidentals necessary, and for doing all the work involved in performing the work as shown and described in the plans and these specifications. 1. Preparation of subsoil and topsoil 2. Topsoil bedding 3. Trees and shrubs 4. Mulch and fertilizer 5. Root Barrier/Moisture Barrier 6. Pre-planting weed control. 7. Maintenance. B. It is the intent of the plans and specifications to provide planting with plants in vigorous growth, ready for Citys use. Any items not specifically shown in the plans or called for in the specifications, but part of the work to conform with such intent, are to be considered as part of the work. C. Plant Establishment: The Contractor shall maintain entire landscape for one hundred eighty (180) days from substantial completion of landscape installation, in accordance with Section 02970 of these Special Conditions. Street pavement rehabilitation, median island construction, landscaping and irrigation and incidental signing, striping and pavement markings. Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements A Online Q&A Yes Q&A Deadline 10/24/2024 11:00 AM (PDT) Questions and Comments. Direct all questions, inquires, and comments regarding these Plans and Specifications only through the online Q&A Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1,000/day Estimated Bid Value $5,391,000 Start/Delivery Date 12/1/2024 Project Duration 90 WD Scope and Operation 1. Pursuant to Labor Code Section 1726, the City is required to take cognizance of violations of the public works laws. Then, either on its own or pursuant to a Notice to Withhold issued by the State Division of Labor Standards Enforcement (Labor Commissioner), the City is required to withhold contract payments to the Contractor in an amount specified in the notice. 2. Pursuant to Labor Code Section 1727, all progress payments, except the final payment, are subject to withholding either by the City or State Division of Labor Standards Enforcement (Labor Commissioner), only after a full investigation. Amounts withheld shall cover and all wages and penalties which have been forfeited. However, the final payment is subject to withholding pending completion of a full investigation. Before making payments to the Contractor of money due under the contract, the City will withhold and retain therefrom all wages and penalties that have been forfeited The work to be performed under this Contract generally consists of pavement rehabilitation of Woodruff Avenue, between Washburn Road and Foster Road, as shown on the Plans. This project includes reconstruction of failed pavement areas, cold milling of asphalt pavement; construction of fiber-reinforced asphalt concrete (AC) base course and asphalt rubber hot mix (ARHM) overlay. Work also includes construction of raised center median islands, repair of uplifted, damaged or substandard concrete curb, gutter, sidewalk, drive approaches and curb ramps; installation of landscaping and irrigation in proposed center median islands and existing frontage road islands, adjustments of manhole and utility valve covers to the new grade, replacement of traffic striping, pavement markings and signing; traffic control and all appurtenant work thereto necessary for the proper construction of the contemplated improvements in accordance to Plans and Specification entitled Capital Improvement Project No. 14-14B

Post-Bid

Roads / Highways

$5,391,000.00

Public - City

Paving, Site Work

37

14

17

5

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
109
Bidding Soon
2,307
All Active Projects
907
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

January 6, 2025

img_map_placeholder

Woodruff Ave, Downey, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.