Site work and paving for a civil project in Beresford, South Dakota. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Solicitation number - ARPA 2022G-ARP-112 Furnish and Install 20 Sanitary Sewer Manholes; o Furnish and Install 15 sanitary sewer pipe point repairs; o Furnish and Install approximately 23,500 LF of 8-inch CIPP; o Furnish and install approximately 400 LF of 10-inch CIPP; o Furnish and Install approximately 1,900 LF of 12-inch CIPP; o Clean and Televise approximately 1,000 LF of 8-inch Sanitary Sewer; o Clean and Televise approximately 1,300 LF of 12-in h Sanitary Sewer; o Furnish and Install approximately 400 CIPP 5-foot Lateral Liners o Furnish and Install approximately 100 Lateral Lining Cleanouts o Furnish and Install approximately 625 LF of 8-inch diameter sanitary sewer pipe (by open cut) o Surface restoration, erosion control, traffic control, reclamation and seeding and all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. Bidders on this work will be required to comply with Title 40 CFR 33 and Executive Order 12138 (WBE). The MBE goal for this project is 1% of the total dollar value of the job while the WBE goal is 4% of the total dollar value of the job. Bidders on this work will be required to comply with the President's Executive Order Nos. 11246 (Equal Employment) as amended, 11518 (Small Business Concerns), and 11625 (MBE) as amended. The goal for female utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 6.9%. The goal for minority utilization which shall be included in all federal and federally assisted construction contracts and subcontracts in excess of $10,000 shall be 1.2%. The goals are applicable to the Contractor's aggregate on-site construction workforce whether or not part of that workforce is performing work on a federal and federally assisted contract or subcontract. Davis-Bacon and related acts provisions apply to this project. All provisions relative to those acts must be met. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein. Question Deadline 10/18/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Est. Value Notes: $4,100,000 to $4,900,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$3,833,540.00

Public - City

Paving, Site Work

96

25

23

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
17
Bidding Soon
240
All Active Projects
125
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

November 28, 2024

img_map_placeholder

Multiple Locations, Beresford, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.