Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and site work for a medical facility in Morton, Illinois. Completed plans call for the demolition of a medical facility; and for site work for a medical facility.
Nursing Home Demolition Any questions or clarifications are to be submitted to engineer on or before the end of day Monday October 21st, 2024. Cash, a cashier's check, a certified check or a Bid bond, payable to the Treasurer of the Village of Morton, Illinois, in an amount equal to five percent (5%) of the total bid price, as a proposal guarantee, shall accompany each such bid. All bidders shall be prequalified with the Illinois Department of Transportation (I.D.O.T.). Bids may be held for a period of up to sixty (60) days prior to making an award. The successful bidder will be required to furnish a satisfactory Contract Bond to the Village of Morton in an amount equal to his contract price. Bonds of any type from the U.S. Insurance Company of America, are not accepted by the Village of Morton. In accordance with 820/ILCS 130/3 and 130/5, this contract is subject to all of the requirements of the Illinois Prevailing Wage Act, is subject to the payment of prevailing wages. Prevailing wages may change monthly and it is the Contractor's responsibility to ensure the correct wage is being paid. The Contractor and Subcontractors are required to submit monthly certified payroll records. In accordance with Public Act 96-0635, effective 1/1/08, all Contractors and Subcontractors, performing any contractual public work subject to the Prevailing Wage Act, shall have in place a written Substance Abuse Prevention Program filed with the public body engaged in public works. The successful Contractor shall file the Substance Abuse Prevention Program (s), with the Village of Morton, prior to award of the Contract. The Board of Trustees of the Village of Morton reserves the right to reject any or all bids and to waive technicalities and irregularities in any or all bids. The work under this contract primarily consists of demolishing the existing nursing home in its entirety. The demolishing of the nursing home includes the salvaging of all paved surfaces, all granular materials under the paved surfaces, all building slabs on grade, and all concrete foundations. Contractor will be responsible for segregating the salvaged materials and hauling to the Village of Morton's Waste Water Treatment Plant. Contractor will also have to coordinate the removal of the building's slab on grade with the asbestos abatement contractor that will be responsible for the removal of the transite duct underneath the slab on grade. The asbestos abatement contractor will be working under a separate agreement with the Village of Morton. Upon completion of the demolition of the project, Contractor will landscape all disturbed areas. The written interpretation or correction so given by the Engineer shall be binding, and prospective Bidders are warned that no other officer, agent, or employee of the Owner is authorized to give information concerning, or to explain or interpret, the Contract.
Post-Bid
Medical
$300,000.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2024
November 25, 2024
191 W Queenwood Rd, Morton, IL
Related To This Project
Morton, IL
--
Morton, IL
Bid Date: Dec 11 2024
Morton, IL
Bid Date: Nov 26 2024
Morton, IL
Bid Date: Nov 08 2024
Morton, IL
Bid Date: Oct 31 2024
Morton, IL
--
Morton, IL
Bid Date: Sep 20 2024
Morton, IL
Bid Date: Sep 20 2024
Morton, IL
Bid Date: Sep 20 2024
Morton, IL
Bid Date: Sep 20 2024
Morton, IL
Bid Date: Aug 15 2024
Morton, IL
Bid Date: Aug 09 2024
Morton, IL
Bid Date: Aug 14 2024
Morton, IL
Bid Date: Aug 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.