BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Sherman, Texas. Completed plans call for the renovation of a water / sewer project.

The Greater Texoma Utility Authority (GTUA) on behalf of the City of Sherman (Owner) is requesting Bids for the construction of the Sherman WTP Sedimentation Basin Mechanism and Filter Media Replacement Package. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Further information regarding this project may be obtained by contacting Lance Klement at lpklement@garverusa.com. Bids shall be accompanied by a cashier's check or certified check upon a national or state bank in an amount not less than five percent (5%) of the total maximum bid price payable without recourse to the City of Sherman, or an original bid bond in the same amount from a reliable surety company licensed by the State of Texas to act as a Surety and be listed on the current U.S. Treasury Listing of Approved Sureties, or a Binder of Insurance executed by a surety company licensed by the State of Texas to act as a surety or its authorized agent as a guarantee that the bidder will enter into a contract and execute a Performance Bond within ten (10) days after notice of award of contract to bidder. Performance, Payment, and Warranty Bonds will be required on the forms provided in the amount of one hundred percent (100%) of the contract price from an approved surety company holding a permit from the state of the project state to act as surety, or other surety or sureties acceptable to the Owner. The Qualifications Statement in the Bidding Documents must be completed and submitted with the bid. In case of ambiguity or lack of clearness in stating bid prices, the Owner reserves the right to adopt the most advantageous construction thereof, to reject any or all bids, and to waive formalities. No bid may be withdrawn within sixty (60) days after the date on which bids are opened. The right is reserved by the Mayor and the City Council, as the interests of the City, to reject any or all bids and to waive any informality in bids received. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Question Deadline 10/24/2024 All questions shall be submitted through Civcast. Questions submitted to Owner or Engineer through other means will not be considered. Questions received less than ninety-six (96) hours prior to the date for opening of Bids may not be answered

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Renovation

18

21

7

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
55
Bidding Soon
3,422
All Active Projects
1,255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.