Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 13, 2024 at 7:00 PM
Updated October 1, 2024
Site work and paving for a civil project in Bay Minette, Alabama. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
County: Baldwin County Contract Time: December 31, 2024 Completion Date DBE Goal Percent:3.00 For constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail Installation, and Traffic Stripe on SR-287 from the junction of SR-59 in Bay Minette to the I-65 Interchange (MP 6.314). Length 4.407 mi. The Bracket Estimate on this project is from $2,866,895 to $3,503,983 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 035 - Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail Installation, and Traffic Stripe on SR-287
Bid Results
Bridges / Tunnels
$3,413,644.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 10 - Specialties
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2024
December 24, 2024

AL-287, Bay Minette, AL
Related To This Project
Bay Minette, AL
Bid Date: Nov 06 2024
Bay Minette, AL
Bid Date: Nov 13 2024
Bay Minette, AL
Bid Date: Dec 05 2024
Bay Minette, AL
Bid Date: Dec 16 2024
Bay Minette, AL
Bid Date: Dec 10 2024
Bay Minette, AL
Bid Date: Dec 17 2024
Bay Minette, AL
Bid Date: Oct 29 2024
Bay Minette, AL
Bid Date: Oct 22 2024
Bay Minette, AL
Bid Date: Oct 01 2024
Bay Minette, AL
Bid Date: Oct 02 2024
Bay Minette, AL
--
Bay Minette, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail Installation, and Traffic Stripe on SR-287
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.