BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Seattle, Washington. Conceptual plans call for the renovation of a municipal facility.

The purpose of this solicitation is to retain the services of a qualified consultant team led by an architectural firm with a proven record of delivering inspired design solutions and the qualifications necessary to achieve the project goals within the framework of a negotiated construction contract in the public realm. The consultant will provide complete design and engineering services, from Schematic Design through Project Closeout. The design will include seamlessly integrated accessibility solutions as well as modifications and additions that rejuvenate the existing terminal while being sensitive to the historic significance of the facility. The consultant will participate in preconstruction activities with the City and the GC/CM; lead the permit process; produce milestone documents for pricing and the final construction documents; and provide construction administration services through project closeout. Deadline for Questions:October 29, 2024, 4:00pm Goals of this project include: Enhancing the overall passenger experience by integrating the station into the Seattle Center campus with elements of placemaking and improved visibility and identity Making the station fully accessible and improving wayfinding Increasing system throughput by reconfiguring ticketing, queuing and boarding Implementing fire and life safety upgrades and other system improvements Making necessary repairs to maintain a state of good repair and extend the life of the facility It is important to note that the monorail needs to remain operational during construction, to the greatest extent possible. This may affect the selection of construction methods and the sequencing of the work by the contractor. This contract is funded, in part, by the U.S. Department of Transportation, Federal Transit Administration, and is subject to the requirements set forth by the FTA Master Agreement. This will be a cost-reimbursement with fixed-fee for profit contract. Estimated construction cost is approximately $13,000,000. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$13,000,000.00

Public - City

Renovation

37

9

5

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
43
Bidding Soon
872
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

img_map_placeholder

370 Thomas St, Seattle, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.