Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 2, 2025 at 8:00 PM
Updated April 3, 2025
Site work and paving for a road / highway in Dallas, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
for the furnishing of all plans, labor, materials, and equipment and the performing of all work required in the construction of the following project: NAIL ROAD APPROACH WIDENING Bids shall be submitted for unit pricing. All unit prices must be stated in both script and figures. Payment shall be made from current funds. Bidders must submit, with their bids, a Bid Bond in the amount of five percent (5%) of the maximum amount bid, payable without recourse to DENTON COUNTY, TEXAS. The successful Bidder must furnish Performance and Payment Bonds each in the amount of one hundred percent (100%) of the contract price from an approved Surety Company. All questions shall be posted to Denton County s on-line bidding service, Denton County online Portal by the stated deadline. All questions and answers will be posted online at Denton County online Portal. Bidders are responsible for ensuring all answers to questions are reviewed prior to bid submittal. The Owner reserves the right to reject any and all bids and to waive formalities. The work as proposed is to be complete and fully acceptable to Denton County. The only compensation will be from the unit priced items listed in the proposal. The CONTRACTOR shall verify all quantities and resolve any disputed quantities before signing the contract. After signing the contract payment quantities will only be revised by approved change order or revisions to the plans. All work not specifically called for, but required to complete the work in accordance with Denton County requirements shall be considered incidental to payments items. CONTRACTOR shall be responsible for erosion and sediment control of on-site materials during construction. The controls shown on the plans are considered minimum requirements. Each contractor will be responsible for the maintenance of these control measures, as well as installation of special control measures, and temporary seeding and mulching needed to facilitate the progress of the work while the site is under his/her control. Said work shall be considered incidental to their respective construction unless specific pay items are listed below. Contractors shall notify the engineer immediately if the controls are not functioning properly and sediment is leaving the site. The contractor shall also be responsible for removal of all temporary erosion and sediment control devices upon completion of the project. Construct a hot-mix asphalt (HMA) pavement layer composed of a compacted, dense-graded mixture of aggregate and asphalt binder mixed hot in a mixing plant. Payment adjustments will apply to HMA placed under this specification unless the HMA is deemed exempt in accordance with Section 3076.4.9.4., "Exempt Production." Questions Due Date: Jan 28th 2025, 2:00 PM CST
Award
Roads / Highways
$123,457.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
March 6, 2025
NAIL ROAD, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Mar 06 2025
Dallas, TX
Bid Date: Nov 19 2024
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Nov 15 2024
Dallas, TX
Bid Date: Oct 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
