Site work for a municipal facility in Quartz Hill, California. Completed plans call for site work for a municipal facility.

The lowest bid shall be determined: On the amount of the base bid. The Owner reserves the right to add or deduct any of the additive or deductive items after the lowest responsible and responsive bidder is determined. Public works projects shall be subject to compliance monitoring and enforcement by the Department of Industrial Relations. A contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to the requirements of Public Contract Code section 4104 unless currently registered and qualified under Labor Code section 1725.5 to perform public work as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code. A contractor or subcontractor shall not be qualified to enter into, or engage in the performance of, any contract of public work (as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code) unless currently registered and qualified under Labor Code section 1725.5 to perform public work. Project Location: 41914 North 50th Street West, Quartz Hill, CA 93536 Time of completion for the Project shall be 90 consecutive calendar days from the start date established in the Owner's notice to proceed letter/notification. Bids must be accompanied by an executed Fingerprinting Notice and Acknowledgment. Owner, or its designee, may determine that certain materials, services, products or things designated by specific brand or trade name shall not be subject to Public Contract Code section 3400(a) in order that a field test or experiment may be made to determine the product's suitability for future use and in order to match other materials, services, products or things in use on a particular Owner public improvement either completed or in the course of completion. If applicable, these specific materials, services, products or things are identified in project specifications. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum, said bonds to be secured from Admitted Surety insurers (an insurance organization authorized by the Insurance Commissioner to transact business of insurance in the State of California during this calendar year). The surety insurers must, unless otherwise agreed to by Owner in writing, at the time of issuance of the bonds, have a rating not lower than "A-" as rated by A.M. Best Company, Inc. or other independent rating companies. Owner reserves the right to approve or reject the surety insurers selected by the successful bidder and to require the successful bidder to obtain bonds from surety insurers satisfactory to the Owner. The bidder will be required to furnish insurance as set forth in the Contract Documents. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between Owner and Contractor and General Conditions. The Owner will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a Class A or B license and shall maintain that license in good standing through Project completion and all applicable warranty periods. Bidder shall state the California contractor license number on the Designation of Subcontractors form for all subcontractors doing more than one-half of one percent (0.5%) of the bidder's total bid. An inadvertent error in listing a California contractor's license number shall not be grounds for filing a bid protest or for considering the bid nonresponsive if the bidder submits the corrected contractor's license number to the Owner within 24 hours after the bid opening, or any continuation thereof, so long as the corrected contractor's license number corresponds to the submitted name and location for that subcontractor. Subcontractors shall maintain their licenses in good standing through Project completion and all applicable warranty periods. Owner reserves the right to reject any bid as nonresponsive if bidder or any subcontractor is not licensed in good standing from the time the bid is submitted to Owner up to award of the Contract, whether or not the bidder listed the subcontractor inadvertently, or if a listed subcontractor's license is suspended or expires prior to award of the Contract. Owner also reserves the right to reject any bid as non responsive if a listed subcontractor's license is not in good standing to perform the work for which it is listed from the time of submission of the bidder's bid to award of the Contract. The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified. Copies of the required rates are on file at the Owner's business office and are available to any interested party on request. The Owner reserves the right to waive any irregularity and to reject any or all bids. Unless otherwise required by law, no bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening thereof or any authorized postponement thereof. The Owner reserves the right to take more than sixty (60) days to make a decision regarding the rejection of bids or the award of the Contract. The Work of the Project is defined by the Contract Documents and consists of the following: 1. Provide all labor and material as required to provide for the complete scope of work indicated in the construction document which includes, but shall not be limited to, the following: a. Provide 6'-0" high concrete masonry unit walls and reinforced concrete foundations, including excavation and compaction at bottom of foundations. b. Provide all incidental clearing, grubbing and grading necessary to facilitate the installation of the walls. Haul away all associated debris and dispose of legally. c. Provide ornamental tube steel rolling gate, including tracks, concrete ribbon for track, rollers, guides, motorized gate operator, controls wiring, etc. Provide all electrical conduit wiring, circuit breakers, etc. required for complete system installation. Program to District standard for remote operation. d. Provide post lighting and all associated electrical work. e. Provide asphalt paving removal and repair as required for new work. f. Provide conduit and boxes for future security cameras. g. Site demolition of existing fencing and other appurtenances as required to perform the new work. THE PROJECT SCOPE OF WORK IS LIMITED TO THE FOLLOWING : 1. PROVIDE A MOTORIZED SLIDING GATE AND FENCING. 2. REMOVAL OF EXISTING CHAIN LINK PERIMETER FENCING AND GATES AS INDICATED. 3. PROVIDE NEW CMU WALLS AND FOUNDATIONS. 4. ALL ASSOCIATED ELECTRICAL WORK INDICATED. JOB NO-3076.0000

Award

Municipal

$499,128.00

Public - City

Site Work

20

15

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
96
Bidding Soon
2,111
All Active Projects
941
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2024

December 9, 2024

img_map_placeholder

41914 50th St W, Quartz Hill, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.