Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Felton, California. Completed plans call for the renovation of a detention facility.
Engineers Estimate (Multi-Use Recreation and Programs Facility): $3,146,934 Engineers Estimate (Renovation and Upgrades): $12,671,749 Project No. 2017-0326, 03 17 00483, 16C1-006 / #18C1-001 The Juvenile Hall Multi-Use Recreation and Programs Facility and the Juvenile Hall Renovation and Upgrades projects were designed as separate projects by different consultant teams. The projects are permitted separately. The County has determined that efficiencies can be obtained by having the same prime contractor perform both projects. Therefore, this contract includes all construction work for both projects. This project is for licensed contractors with a Type B, General Building Contractor's license. Multi-Use Recreation and Programs Facility: Install a pre-engineered steel structure containing a gymnasium, restrooms, training/program rooms, storage and mechanical/ equipment spaces, as well as minor utility, grading, drainage, fencing, walkways, and related site improvements. Plans and specifications have been prepared by William Fisher Architecture, Inc. and Whitson and Associates, Inc. DBA Whitson Engineers. Renovation and Upgrades: Perform a renovation to an existing kitchen, dining room, support spaces, laundry, and replacement of all cell doors. Work also includes renovations of existing day rooms, and central control space. Barrier removal and access upgrades are required throughout the areas of work and the exterior site including restrooms and drinking fountains. Site work includes replacing damaged areas in parking lots, fixing accessible paths of travel, creating a teaching garden, providing and installing a premanufactured storage shed and greenhouse, and replacement of all perimeter security fencing. Plans and specifications have been prepared by Nelson Worldwide (formerly CGL Companies). This project is located at 3650 Graham Hill Road, Felton, CA 95018 at the Santa Cruz County Juvenile Hall facility. Question Deadline 10/31/2024 at 5:00 PM PT, Question Response Deadline : November 8, 2024, 5:00pm, Any questions concerning the bid process, required submittals, evaluation criteria, bid schedule, and selection process should be sent through the online. DO NOT Email inquiries. The engineer's estimate for the Multi-Use Recreation and Program's Facility project is $3,146,934. The engineer's estimate for the Renovation and Upgrades project is $12,905,426. There are 365 calendar days in this contract. Each bidder must submit a bid proposal for the project via the online portal's bid form. Said proposal shall be accompanied by a cashier's check, a certified check or bidder's bond of ten percent (10%) of the amount of the bid submitted, to be made payable to the County of Santa Cruz. Bid bonds shall be issued by a corporate surety duly admitted and authorized to issue bonds and undertakings by the State of California. Background The Juvenile Hall is a secured facility and will remain operational during construction, requiring phasing of the work and specific access protocols. Background checks for every person on site will be required. The County will receive funding for the projects from the State through SB81 which necessitates keeping the financial records separate. There is a sample pay application included in volume I of the specifications. There are Incidental Take Permits with United States Fish & Wildlife Service for both projects for the Mount Hermon June beetle that require specific fencing and ground covering measures that are outlined in the Supplemental Conditions and specification attachments. County will be the sole judge as to the technical acceptability of any proposals and any award will be as determined most advantageous to the County considering such factors as completeness and responsiveness to Request for Proposal, experience, references, and anticipated costs. The County reserves the right to reject any or all proposals or parts thereof and to waive any informality or irregularity in any proposal. Pursuant to Santa Cruz County Code Chapter 2.33, Contractors and Subcontractors must make good faith efforts to hire Monterey Bay area residents in sufficient numbers so that no less than 50 per cent (50%) of the Contractor's total construction work force, including any subcontractor's workforce, measured in labor work hours is comprised of Monterey Bay area residents. This public works construction project is covered by Chapter 2.33 of the Santa Cruz County Code, and the entire chapter, as amended, is incorporated by reference into the project's specifications and conditions. Any bid proposal or other response to a solicitation for bid or proposal which proposes or calls for the use of any tropical hardwood or tropical wood products in performance of the contract shall be deemed nonresponsive pursuant to County Code Section 2.37.107. Doc info : A returned check will be subject to an additional fee of $40.
Post-Bid
Jails / Prisons
$15,818,683.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 22, 2024
January 22, 2025
3650 Graham Hill Rd, Felton, CA
Related To This Project
Felton, CA
Bid Date: Aug 30 2024
Felton, CA
Bid Date: Jul 31 2024
Felton, CA
Bid Date: Jun 12 2024
Felton, CA
Bid Date: Oct 24 2023
Felton, CA
Bid Date: Dec 17 2021
Felton, CA
Bid Date: Aug 11 2023
Felton, CA
Bid Date: Jan 31 2023
Felton, CA
Bid Date: Sep 08 2022
Orange, CA
Bid Date: Nov 05 2024
Redding, CA
Bid Date: Nov 04 2024
San Jose, CA
Bid Date: Nov 27 2024
Monterey Park, CA
--
San Rafael, CA
Bid Date: Oct 30 2024
San Diego, CA
Bid Date: Nov 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.