Renovation of a clubhouse / community center in Farmington, Minnesota. Completed plans call for the renovation of a 12,335-square-foot clubhouse / community center.

Project Summary: Renovation of a 12,335 sf community facility for seniors. Renovations include converting part of the existing garage into a fitness room, replacing the entire roof, and replacing all exterior doors and windows. The building will receive new roof top mechanical units, ductwork and zoning; new electrical wiring, light fixtures, and panels in select areas; and new plumbing piping and fixtures in select areas. New switchgear. New interior finishes including flooring, ceiling tile, and painting. Site work includes a new concrete patio, planting bed, new arbor structures. No bid will be read or considered which does not fully comply with the above requirements as to bond The design team and City of Farmington representatives will review the Contract Documents with Bidders and Subcontractors, and will respond to all contractor and subcontractor questions. A site tour will follow allowing Bidders to inspect the existing site and building, to inform themselves of the existing conditions. Each bidder must inform themselves fully of the conditions relating to the construction of the project. Failure to do so will not relieve a successful bidder of their obligation to furnish all materials and labor necessary to carry out their work and must employ such methods and/or means as will not cause any interruption of, or interference with the work of any other contractor. Question Deadline 10/29/2024 The Bidder shall carefully study and compare the Bidding Documents with each other, and with other work being bid concurrently or presently under construction to the extent that it relates to the Work for which the Bid is submitted, shall examine the site and local conditions, and shall at once report to the Architect errors, inconsistencies, or ambiguities discovered. B. Bidders and Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect at least seven days prior to the date for receipt of Bids Addendum #1 has been issued as of 10-17-2024

Bid Results

Clubhouse / Community Centers

$2,021,126.00

Public - City

Renovation

61

35

54

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
80
Bidding Soon
776
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

January 6, 2025

img_map_placeholder

325 Oak St, Farmington, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.