BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Lincoln, Nebraska. Completed plans call for site work for a playground / park / athletic field.

In order to participate you must submit your Statement of Qualifications electronically through this eBid system as a Response Attachment. No paper submissions will be accepted. The University of Nebraska - Lincoln, is seeking qualified Prime Contractors to serve as the lead builder for a comprehensive reconstruction and modernization of their two outdoor natural grass practice fields and associated features. The initial step of selecting the best value builder is to pre-qualify Prime Contractors to create an approved pool of builders to ultimately submit bids/proposals to lead and complete the work in 2025. Construction would be estimated to begin the first week of February, 2025 with a completion date of July 1, 2025. The project scope of work includes the demolition and reconstruction of two natural grass practice fields (Fields #2 & #3) at the University of Nebraska - Lincoln. The existing practice fields will have the field profiles removed down to subgrade including the irrigation and drainage infrastructure and re-built from a newly established subgrade. The new fields will be sand-based high-performance natural grass fields with new irrigation, new drainage, new electrical and communications, and new synthetic turf perimeter aprons. Contractor will also rework/replace existing site fence, construct concrete cast-in-place retaining walls and remove and reinstall four football field goal posts complete with netting and accessories. Training support features will include in-ground sports equipment, new electronic displays/timing, convenience power, drinking water, ball capture kicking nets, and wi-fi antenna systems. It is the intent of the University of Nebraska to award a Single Prime Contract covering the work of all trades per the project description. The Owner will procure new high-performance turf for the Prime Contractor to install. Owner will also procure and install new Scoreboard and timing clocks. Prime Contractor will provide and install all power and data, footings, foundations and support structure for the scoreboard and timing clocks provided by Owner.

GC Bidding

Playgrounds / Parks / Athletic Fields

$700,000.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
41
Bidding Soon
491
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2024

February 3, 2025

img_map_placeholder

1400 R St, Lincoln, NE

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.