BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Concord, New Hampshire. Completed plans call for the renovation of a educational facility.

The Community College System of New Hampshire (CCSNH) is soliciting proposals from a qualified contractor/vendor to design, fabricate, deliver, install, operate, and maintain ground mounted and roof mounted utility-interactive solar photovoltaic (PV) systems to be directly owned by CCSNH and The Boys & Girls Club of Central & Northern New Hampshire. The contractor/vendor must demonstrate the ability to perform the work described in the scope of services set forth in this solicitation and have demonstrated experience successfully performing comparable work. Project: Ground-Mounted and Roof Mounted Grid-Tied PV Systems 1.1.1. Location 1: 1 College Place, Claremont, NH 03743 1.1.2. Location 2: Boys & Girls Club of Concord - 55 Bradley Street, Concord, NH 03301 1.1.3. Location 3: Boys & Girls Club of Suncook - 8 Whitten Street, Allenstown, NH 03275 1.1.4. Location 4: Belmont Early Learning Center - 24 Eastgate Park, Belmont, NH 03220 1.1.5. Location 5: Boys & Girls Club of the Lakes Region - 876 N. Main Street, Laconia, NH 03246 All inquiries should be submitted via email and be directed to: Name: Sean Fitzpatrick Email: sfitzpatrick@ccsnh.edu The contractor shall perform all professional services as necessary to provide CCSNH with a complete design package, including the requirements outlined in this statement of work. The contractor shall install the project such that it is operational and compliant with all applicable standards, building codes, Utility interconnection requirements, and New Hampshire requirements. The contractor shall include specifications, calculations, and drawings in the design package and submit it to CCSNH for review and approval. After approval by CCSNH of the final design package, the contractor shall provide all necessary construction services to successfully complete the PV system installation. The awarded contractor shall apply for and manage incentives and rebate funding and renewable energy certificates (RECs) paperwork. RECs will be the property of the CCSNH and The Boys & Girls Club unless otherwise noted.

Post-Bid

Educational

$1,300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
116
Bidding Soon
1,954
All Active Projects
794
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

March 3, 2025

img_map_placeholder

Multiple Locations, Concord, NH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.