BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Spring, Texas. Completed plans call for the renovation of a 490,000-square-foot educational facility.

Woodlands High School Renovations The Owner, Architect and Construction Manager Reserve the Right to Reject Any and All Proposals and to Waive Any Informalities in the Proposal Process. This is a renovation of the existing high school with scopes including: 01 Install ADA Compliant Ramp @ handicap parking entrance to school 03 Install ADA accessible path leading to visitor bleachers. Install ADA Placards on ADA Spaces on Bleachers on Baseball Field 08 Repair existing concrete collars and adjust existing sanitary sewer clean outs located outside of band hall 11 Apply waterproofing sealant at window glass and frame interface 13 Remove & replace existing roof system (Field House) 14 Remove & replace existing roof system (modBit) 15 Replace Flooring 16 Replace Ceilings &Repaint 17 Replace Interior Doors in Non Renovated areas 18 Replace Casework 19 Replace markerboards in nonrenovated area 20 Renovate existing restroom 22 Graphics in Gym & Dining 23 Replace Display cases in Gym Lobby, Athletics Corridor, and Art 24 Replace Gym Wall Padding 25 Replace Bleachers 26 Replace Boys Athletic Lockers 27 Replace Secondary switch gear GE, Building Wide 28 Replace Secondary switchgear - Motor Control Center MCC1 29 Replace Secondary switchgear - Motor Control Center MCC2 30 Replace Service entrance switchgear - MSB1 3000 amp 31 Replace Service entrance switchgear - MSB2 4000 amp 32 Replace Service entrance switchgear - MSB33000 amp 33 Replace Service entrance switchgear where equipment rated 800 amp or more should have panic hardware 34 Provide Generator 500KW (existing is Cummins) 35 Provide DDC controls replacement and upgrade (EXISTING AUTOMATED LOGIC 2009) 36 Replace Boiler (AO Smith 2002) 37 Replace Boiler (Sellers 1995) 38 Replace Central Station Air handling Units 42 Replace Split System AC Units 44 Replace cooler & Freezer Refrigeration Condensing Units and Evaporator Coils 45 Relocate or replace Loading Gallery Hand Rail 46 Replace Kiln 47 Provide integrated projection and portable sound in band, orchestra, choir, theater, dance 48 Outdoor Dining Improvement (court yard) 49 Full replacement of Auditorium Sound (audio) System 50 Renovate auditorium control booth: access, enclosure, and sound connection 51 Replace / Refurbish Auditorium Seating Estimate 986 Seats 52 Update dressing rooms: lighting, power, remove shower, fix toilets 54 Scene Shop Remodel 55 Electrical work in Black Box (dimmer fires) and add power to BB 56 Fix 2nd Floor mechanical room M210 Acoustics that affects auditorium house 57 Move Lighting Racks close to stage 58 Fix House Lights - new 60 Replace Acoustical Panels in House 61 Relocate house speaker or relocate vertical house lighting (house speakers currently obstruct light to stage) 62 Address leaking enclosed orchestra pit 63 Provide 10'x10' overhead rolling door to scene Shop. 64 Replace Orchestra Hall & Percussion room doors to be able to secure and sound proof 65 Renovate Choir practice rooms/Offices to become internally functional storage rooms 67 Fix humidity in Orchestra 68 Repair Lights in Large Group Instruction 71 Provide new painted graphics on walls 72 Provide Wayfinding Graphics 73 Replace Classroom ID Plaques to have clear insert 77 Replace Monument Sign 78 Replace vinyl coated chain link fencing with ornamental Iron Fencing & gates (LF 6'h) 83 Catwalk at Auditorium 84 Add Cameras to the parking near the Band Hall 90 - Add Lobby to entrance at Competition Gym(1250 SF) 91 - Add high volume fans to Gym and cafeteria 92 - Dual Duct mixing boxes and duct 93 - Security - card reader access 94 - Exhaust fans 95 - Mini-splits for IDF Alternates: Alternate No. 1 Canopy Three: State in the proposal form the amount to be added to the base proposal for providing aluminum Courtyard Canopy Three (3) Alternate No. 2 Canopy Four: State in the proposal form the amount to be added to the base proposal for providing aluminum Courtyard Canopy Four (4) Alternate No. 3 Locker Removal: State in the proposal form the amount to be added the base proposal for removal the student lockers in the corridors on levels one, two and three. Generally, this scope requires removal of the lockers and demolition of the partition and erecting the scheduled partition and wall tile finish in the location shown. Alternate No. 5 Band Hall Canopy: State in the proposal form the amount to be added to the base proposal for providing aluminum canopy system at the band hall. Refer to sheet A1.23 Questions: You can direct any questions to Justin Harris (jharris@pogueconstruction.com)

Post-Bid

Educational

$50,000,000.00

Public - City

Renovation

529

30

53

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
79
Bidding Soon
2,718
All Active Projects
960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.