Site work and paving for a civil project in Lewiston, Maine. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

Following Construction of a 5.25 (rise) x 7.5 (span) concrete box culvert across Robinson Gardens in accordance with the United States Army Corps of Engineers (ACOE) Pre-Construction Notification (PCN) Permit (NAE-2024-00327). Relocation of the adjacent 24 diameter reinforced concrete Jepson Brook Interceptor Sanitary Sewer. Reconstruct concrete channel, wingwalls, and headwalls to accommodate the proposed culvert. Construct water main extension to accommodate the new culvert. Water main extension/offset materials supplied by the City. Modify existing garage and foundation at #40 Robinson Gardens per Haley Ward plans. Remove existing brick walkway and concrete patio at #40 Robinson Gardens. Extend driveway reconstruction at #40 Robinson Gardens to align with the back of the house. Disassemble above-ground pool at #41 Robinson Gardens and reassemble pool after construction. Box-cut and install roadway gravel. Pave disturbed roadway sections. Grind butt joins as needed. Repair lawn areas as necessary. a bid bond or certified check in the amount of five percent (5%) of the total bid price, made out in favor of the City of Lewiston. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, The Contractor shall complete the scope of work outlined in the Contract Documents by no later than October 30, 2025.The Contractor shall be responsible for ordering his/her materials promptly

Award

Bridges / Tunnels

$1,496,995.00

Public - City

Paving, Site Work

21

6

5

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
435
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

img_map_placeholder

Robinson Gardens, Lewiston, ME

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Robinson Gardens Box Culvert Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.