BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boulder City, Nevada. Completed plans call for site work for a water / sewer project.

This Work Shall Include Furnishing All Labor, Material and Equipment to Complete the Project Water Service Replacements - Waters Edge as Described in the Specifications and Shown in the Plans. Work Includes Removals of Existing 3/4", and 1 1/2 " Water Services, Relocation of Existing Service Lines as Needed to Attain 4' Separation Between Water and Sewer Laterals and Make the Service Line Perpendicular to the Water Main, Connection to Existing Or Relocated Corporation Stop at the Main With a Brass Adapter, and Installation of New Copper or Municipex Water Service (Size to Match Existing) From the Main to the Meter for 43 Water Services Within Boulder City. This Work Shall Also Include Installation or Replacement of Water Meters, Meter Boxes, and/or Encoder Receiver Transmitter Modules (ERTs) for Locations Specified (These Items Will Be Supplied by the City). This Project Shall Include Asphalt Replacements. The Contractor, as provided for in the General Conditions, shall pay to the City as fixed and agreed liquidated damages, the amount of $1,500 for each calendar day delay in completion of the work beyond the date specified in the "Notice to Proceed" for the completion of the contract. The Contractor shall be required to achieve completion of the work sufficiently in advance of the Completion Date to complete/correct all deficient items to achieve Final Completion by or before the Completion Date as specified in the "Notice to Proceed." Beneficial use of the improvements by the Owner does not cease the accrual of liquidated damages nor change the daily amount of liquidated damages withheld for each calendar day delay in completion of the work beyond the date specified in the "Notice to Proceed." The Contractor shall, as provided for in the General Conditions of these specifications, submit to the Designated City Project Representative one copy of each permit necessary for the prosecution of the work. The Contractor shall not include in the proposal any separate costs for such permits. The Contractor shall acquire a Boulder City Business License prior to beginning any work. All subcontractors must acquire a Boulder City Business License prior to beginning any work on the site. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. Workman's Compensation Insurance, Faithful Performance Bond in the amount of one hundred percent (100%) of the total bid price, a Labor and Material Bond in the amount of one hundred percent (100%) of the total bid price, and a Guarantee Bond will be executed as part of the contract agreement. COMPLETION OF WORK: All work including deficiency list items must be completed within ninety (90) calendar days after the date of the *Notice to Proceed by the Owner. The Contractor shall provide a one-year warranty for the scope of work performed in this contract. The one-year warranty shall be from the date of the Notice of Completion. Question Deadline 10/17/2024 at 12:00 PM PT ENGINEER'S ESTIMATE OF PROBABLE COST: $300,000 - $352,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$302,215.00

Public - City

Site Work

5

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
391
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 25, 2024

img_map_placeholder

Multiple Locations, Boulder City, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.