Published November 15, 2024 at 7:00 PM

Updated November 16, 2024

Site work for a civil project in Willoughby Hills, Ohio. Completed plans call for site work for a road / highway; and water / sewer project.

OPINION OF PROBABLE CONSTRUCTION COST: $2,600,000.00 COMPLETION DATE: JUNE 27, 2025 Each bid must be accompanied by a certified or cashier's check in the amount of 10% of the amount bid, an irrevocable letter of credit in the amount of 10% of the amount bid or an original bond in the amount of 100% of the amount bid per ORC 153.54 and 153.571. All questions during bidding should be addressed to Lene C. Hill at (440) 530-2212 for Waterline and Michael Sasso at (419) 214-5022 for Soil Stabilization. A. Part A - Waterline Replacement: The project consists of installation of approximately 2900 linear feet of 12" waterline, 53 service line replacements, connections to waterlines on three side streets, new hydrants, waterline abandonment of an existing 12" waterline and an existing 8" waterline, trench repairs, sidewalk restoration and curb replacement. Pay items for the waterline within the retaining wall limits will need to be tracked separately due to funding sources. B. Part B - Soil Stabilization: This project installs 300-feet of drilled shaft plug pile retaining walls and 400-feet of incidental roadway improvements to remediate the slope failures along River Street. The wall consists of 30-inch diameter concrete drilled shafts, reinforced with grade 50 ksi strength steel, W24x62 structural sections spaced at 4 feet on center and socketed into bedrock. Between each reinforced drilled shaft, a 30-inch unreinforced concrete drilled shaft (called plug pile) will be placed to serve as lagging. New guardrails will be installed behind guardrails and in front of the wall. The roadway alignment and lane widths will be adjusted to the west to improve retaining wall integrity while still maintaining typical roadway design criteria. Bid Result - Part A - Fabrizi Trucking and Paving Co - 961311 Part B - S.E.T. Inc. - 1224259.92

Bid Results

Water / Sewer

$2,185,571.00

Public - City

Site Work

44

17

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
111
Bidding Soon
1,805
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 31, 2024

Project location map

River St, Willoughby Hills, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.