Published November 15, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a civil project in Willoughby Hills, Ohio. Completed plans call for site work for a road / highway; and water / sewer project.

OPINION OF PROBABLE CONSTRUCTION COST: $2,600,000.00 COMPLETION DATE: JUNE 27, 2025 Each bid must be accompanied by a certified or cashier's check in the amount of 10% of the amount bid, an irrevocable letter of credit in the amount of 10% of the amount bid or an original bond in the amount of 100% of the amount bid per ORC 153.54 and 153.571. All questions during bidding should be addressed to Lene C. Hill at (440) 530-2212 for Waterline and Michael Sasso at (419) 214-5022 for Soil Stabilization. A. Part A - Waterline Replacement: The project consists of installation of approximately 2900 linear feet of 12" waterline, 53 service line replacements, connections to waterlines on three side streets, new hydrants, waterline abandonment of an existing 12" waterline and an existing 8" waterline, trench repairs, sidewalk restoration and curb replacement. Pay items for the waterline within the retaining wall limits will need to be tracked separately due to funding sources. B. Part B - Soil Stabilization: This project installs 300-feet of drilled shaft plug pile retaining walls and 400-feet of incidental roadway improvements to remediate the slope failures along River Street. The wall consists of 30-inch diameter concrete drilled shafts, reinforced with grade 50 ksi strength steel, W24x62 structural sections spaced at 4 feet on center and socketed into bedrock. Between each reinforced drilled shaft, a 30-inch unreinforced concrete drilled shaft (called plug pile) will be placed to serve as lagging. New guardrails will be installed behind guardrails and in front of the wall. The roadway alignment and lane widths will be adjusted to the west to improve retaining wall integrity while still maintaining typical roadway design criteria. Bid Result - Part A - Fabrizi Trucking and Paving Co - 961311 Part B - S.E.T. Inc. - 1224259.92

Bid Results

Water / Sewer

$2,185,571.00

Public - City

Site Work

44

17

4

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
77
Bidding Soon
1,032
All Active Projects
428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 31, 2024

img_map_placeholder

River St, Willoughby Hills, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

River Street Waterline Replacement Part A and Soil Stabilization Project Part B

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.