Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 17, 2024 at 8:00 PM
Updated October 24, 2024
Site work for a civil project in Woodland Park, Colorado. Conceptual plans call for site work for a water / sewer project.
Reference Number 0000361737 Delivery Point: City of Woodland Prk Gold Hill Tank Sitee Bid Intent Not Available The City of Woodland Park has an existing Gold Hill Tank with a volume of 650,000 gallons that is 32 ft tall. The Gold Hill Tank and associated pressure zone within the distribution system are served by the Gold Hill Pump Station which is equipped with two constant speed pumps. The service area of the pressure zone served by this tank includes homes along with key community facilities including the hospital, college and lumber yard. The existing Gold Hill Tank is welded steel and a tank inspection completed on June 9, 2022 indicates that the interior of the tank has extensive corrosion and corrosion failure with bare steel exposed and pitting. To allow the tank to continue providing reliable service, the interior of the tank needs to be sand blasted and recoated soon which is estimated to take 3 to 4 months. During the time that the tank is being refurbished, a second tank will be required to provide fire flow and operational storage for the distribution system. This scope assumes the tank will be a bolted steel tank with glass or epoxy coating and will be located on the same site as the existing tank. This report presents the results of a geotechnical investigation performed for the proposed Gold Hill water storage tank to be constructed at 1340 W. Midland Avenue in Woodland Park, Colorado. An attached Vicinity Map (Figure 1) shows the general location of the project. Our investigation was performed for the City of Woodland Park and was authorized by Mr. Kip Wiley. Question Deadline 10/25/2024 at 5:00 PM MT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required - License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Payment Bond 50 %
Conceptual
Water / Sewer
$100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2025
1340 W Midland Ave, Woodland Park, CO
Related To This Project
Woodland Park, CO
Bid Date: Nov 08 2024
Woodland Park, CO
Bid Date: Dec 18 2024
Woodland Park, CO
Bid Date: Dec 11 2024
Woodland Park, CO
Bid Date: Feb 21 2025
Woodland Park, CO
Bid Date: Feb 14 2025
Woodland Park, CO
--
Woodland Park, CO
Bid Date: Apr 11 2025
Woodland Park, CO
--
Woodland Park, CO
Bid Date: Feb 06 2026
Woodland Park, CO
Bid Date: Jul 19 2024
Woodland Park, CO
Bid Date: Jun 21 2024
Woodland Park, CO
Bid Date: Jun 24 2024
Woodland Park, CO
Bid Date: Jun 10 2024
Woodland Park, CO
Bid Date: May 06 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
