Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Branson, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Cliff Drive Culvert Improvements Project Each bidder shall file with his bid a cashier's check, certified check or a bidder's bond for 5 percent (5%) of the total amount of the base bid made payable to the City of Branson, Missouri, hereinafter referred to as the Owner. Electronic bid bonds may be uploaded with the bid submission or submitted by sing partners, Surety 2000 or Surety Wave. Cashier's check or certified check shall be submitted to address below and must be received prior to the bid opening date. The bidder to whom a contract is awarded will be required to furnish a performance bond and a payment bond on the forms provided, acceptable to the City of Branson, Missouri, each in the amount of 100 percent (100%) of the contract price, in conformity with the requirements of the General Conditions. Wage rates paid on construction work for this project shall be at least equal to the prevailing wage rates as determined by the Division of Labor Standards of Missouri. Enrollment in Federal Work Authorization Program Bidders are informed that pursuant to Section 285.530, RSMo, as a condition of the award of any contract in excess of five thousand dollars ($5,000.00), the successful bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection to the contracted services. Successful bidders shall also sign an affidavit affirming that it does not knowingly employ any person who is an unauthorized alien in connection to the contracted services. Affidavit for Service Contracts The Bidder agrees to provide a certification if requested by the City of Branson, in accordance with Sec. 34.600, RSMo that they have not engaged in a boycott of: Goods or services from the State of Israel; Companies doing business in, or with, Israel; Companies authorized by, licensed by, or organized under, the laws of the State of Israel; or Persons or entities doing business in the State of Israel. Safety Training Bidders are informed that the Project is subject to the requirements of Section 292.675, RSMo, which requires all contractors or subcontractors doing work on the Project to provide, and require its on-site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration ("OSHA") or a similar program approved by the Missouri Department of Labor and Industrial Relations which is at least as stringent as an approved OSHA program. The training must be completed within sixty (60) days of the date work on the Project commences. On-site employees found on the worksite without documentation of the required training shall have twenty (20) days to produce such documentation. The Contractor and his subcontractors will be obligated not to discriminate in employment practices. Contract time will be specified in the Bid Form. No Bid may be withdrawn within a period of 90 days after the date fixed for opening Bids. The Owner reserves the right to reject any or all Bids, to waive informalities, and to reject nonconforming, nonresponsive, or conditional Bids.
Post-Bid
Bridges / Tunnels
$400,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2024
December 13, 2024
Cliff Dr, Branson, MO
Related To This Project
Branson, MO
Bid Date: Nov 21 2024
Branson, MO
Bid Date: Nov 25 2024
Branson, MO
Bid Date: Nov 27 2024
Branson, MO
Bid Date: Dec 05 2024
Branson, MO
Bid Date: Dec 05 2024
Branson, MO
--
Branson, MO
Bid Date: Dec 06 2024
Branson, MO
Bid Date: Nov 21 2024
Branson, MO
--
Branson, MO
--
Branson, MO
Bid Date: Oct 11 2024
Branson, MO
Bid Date: Dec 18 2024
Branson, MO
Bid Date: Sep 12 2024
Branson, MO
Bid Date: Sep 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.