EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 16, 2024 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a mixed-use development in Plano, Texas. Completed plans call for the renovation of a educational facility; and for site work for a playground / park / athletic field.

Jackson Elementary School System & Compliance COMPETITIVE SEALED PROPOSALS FOR CSP# 2024-12-048 Jackson Elementary School System & Compliance for the Plano Independent School District will be received at the Plano Independent School District Purchasing Department, 6600 Alma, Plano, Texas 75023. Each Proposer shall identify their sealed Proposal by typing on the outside of the envelope: PROPOSAL NAME" FOLLOWED BY THE CORRESPONDING CSP # AS SHOWN BELOW. Jackson Elementary School System & Compliance CSP #2024-12-048 SCOPE OF WORK: Five (5) Dedicated Outside Air Systems replacement with new curbs and full HVAC controls campus wide. Replacing fire sprinkler valves. Replacement of new built-up roof system with 20-year warranty as specified. Replacement of corridor flooring finishes. New playground fencing and marquee sign ESTIMATED BUDGET AND PROJECT SITE LOCATION Estimated Budget - $3,055,000, $165,000 Owner's Contingency and $280,000 Lighting Control Allowance and $25,000 Damaged Roof Deck Allowance Project Site Location: Jackson Elementary - 1101 Jackson Dr, Plano, TX 75075 Date for Construction Agreement: Presented to the Board on or about December 10, 2024. It is vendor responsibility to obtain any addenda that pertains to this proposal. CRITERIA FOR SELECTION Per Section 2269.055, (Texas Government code) "In determining to whom to award a contract a district may consider: Purchase price; The offeror's experience and reputation; The quality of the offeror's goods or services; The impact on the ability of the governmental entity to comply with rules relating to historically underutilized businesses; The offeror's safety record; The offeror's proposed personnel; Whether the offeror's financial capability is appropriate to the size and scope of the project; and Any other relevant factor specifically listed in the request for bids, proposals, or qualifications Evaluative criteria will have the following weights assigned to rank Proposals: Cost-30 points, Qualifications-20 points, Reputation-20 points, Experience-20 points, and District Needs-10 points. All other criteria will be assigned the value of zero. Using these criteria and weights District Committees will evaluate and rank Proposals to determine the Proposer that presents the best value to the District. Per Section 44.043 of the Texas Education Code, In engaging in an activity to which this section applies, a governmental entity: 1. May not consider whether a person is a member of or has another relationship with any organization; and 2. Shall ensure that its Proposal specifications and any subsequent contact or other agreement do not deny or diminish the right of a person to work because of the person's membership or other relationship status with respect to any organization. Owner reserves the right to reject any or all bids and to waive irregularities or informalities as may be deemed in Owner's interest. For additional information, see the Instructions to Proposers in the Proposal documents for each project or call the PISD Purchasing Department 469-752-0290. The Board of Trustees, for the purpose of complying with Section 2258, Subchapter B of the Texas Government Code for all public contracts, has adopted the prevailing wage rates as determined by the United States Department of Labor in accordance with the Davis-Bacon Act as the published rates for the District. These rates are listed on the following website. It is the responsibility of the contractor to pay the appropriate rate or higher on the construction project or be subject to penalty as set forth in section 2258.023 of the Texas General Government Code Question Deadline 10/29/2024 at 4:00 PM CT Renovations to the existing Elementary School including lighting and controls; replacing valves on the fire sprinkler system; replacing HVAC controls, units, and screens; new marquee sign, full roof replacement, and site fencing around the playground, and other Work indicated in the Contract Documents

Award

Educational

$4,769,000.00

Public - City

Renovation, Site Work

49

26

68

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Entrances and Storefronts, Storefronts, Windows, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, Duct Liners, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Trenching, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
71
Bidding Soon
3,007
All Active Projects
1,388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Jackson Elementary School System & Compliance Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.