BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Greensboro, North Carolina. Conceptual plans call for the renovation of a educational facility.

UNC Greensboro is seeking letters of interest from qualified professionals for the project entitled, Campus Chilled Water Infrastructure and Equipment Improvements Phase II. The scope of the project is to address the remaining chilled water infrastructure needs identified in our 2020 campus master plan that were unable to be addressed as part of an ongoing Phase 01. This includes: the replacement of a 750-ton chiller with a new 1500-ton chiller and supporting infrastructure and extending the campus chilled water loop to Tower Village, a student residential complex. The aging chiller needs replacement, and the new chiller and associated equipment is to provide reliable chilled water production for the next 20-25 years. The potential to implement additional equipment to add needed capacity to the plant will also be addressed as part of this project. All work will be fully integrated with the campus Building Automation Systems (BAS). * Failure to follow the directions or contacting anyone other than the listed contact may result in submission being classified as non-responsive. Intended Schedule: November 15, 2024 - Notify Shortlist Selections for Interview Week of December 9, 2024 - Shortlist Interviews Please go to the following website for further information regarding submission requirements. To view a map of the UNC Greensboro campus and locate the structures included in this project, visit website. Responses should be no more than (60) pages at 8.5 x 11 or (30) spreads at 11 x 17, excluding SF-330 form and blank pages. Submit one (1) electronic (PDF) copy of the response in the following format: Tab 1: Completed Information Sheet* Tab 2: Letter of Interest (Cover Letter) Tab 3: Project Team Organization Chart 3.1 Adequate staff and proposed design or consultant team and their relevant project experience Tab 4: Relevant Experience & Other Important Factors 4.1 Specialized or appropriate expertise in the type of project 4.2 Past performance on similar projects to Campus Chilled Water Infrastructure and Equipment Improvements Phase II 4.3 Current workload and State projects awarded 4.4 Proposed design approach for the project 4.5 Recent experience with project costs and schedules (include projects most similar to Campus Chilled Water Infrastructure and Equipment Improvements Phase II 4.6 Construction administration capabilities 4.7 Proximity to and familiarity with the area where project is located 4.8 Record of successfully completed projects without major legal or technical problems 4.9 Energy Conservation/LEED Experience Tab 5: Minority Business Participation Plan (include design and construction efforts to reach UNCG HUB goals) Tab 6: Current * On your completed Information Sheet, please include the primary contact person's name and email address which will be used by the University for all future communications. * The Proposal (Tabs 1-5 above) will be reviewed for firms' qualifications as Letter of Interest. As a reminder, the SF-330 (Tab 6) is an attachment to the proposal and is viewed as such. It is not a supplement or replacement for the proposal itself and will not be formally reviewed in the detail as Tabs 1-5. For driving directions to Gray Home Management House and parking information, visit website. One-Two Sentences UNC Greensboro is seeking letters of interest from qualified professionals for the project entitled, Campus Chilled Water Infrastructure and Equipment Improvements Phase II. The scope of the project is to address the remaining chilled water infrastructure needs identified in our 2020 campus master plan that were unable to be addressed as part of an ongoing Phase 01. This includes: the replacement of a 750-ton chiller with a new 1500-ton chiller and supporting infrastructure and extending the campus chilled water loop to Tower Village, a student residential complex. The aging chiller needs replacement, and the new chiller and associated equipment is to provide reliable chilled water production for the next 20-25 years. The potential to implement additional equipment to add needed capacity to the plant will also be addressed as part of this project. All work will be fully integrated with the campus Building Automation Systems (BAS). Project Manager Bill Chatfield Phone Number (336) 334-4545 Contact Email wjchatfi@uncg.edu Project Budget $5,726,250

Conceptual

Educational

$5,726,250.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
72
Bidding Soon
1,560
All Active Projects
583
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2025

img_map_placeholder

1400 Spring Garden St, Greensboro, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.