BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and paving for a civil project in Edgerton, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Description: Mill, level and overlay involving asphalt paving, fencing, chip seal, traffic control and stormwater drainage work on approximately 7.30 miles on WYO 387 beginning at RM 93.54 between Edgerton and Smokey Gap. The Completion date has changed from October 31, 2025 to July 31, 2026 Pre-Qualification: Yes County : Natrona WYDOT - Call No. 001 - Edgerton - Smokey Gap (Smokey Gap Section) - WYO 387 An electronic bid bond is preferred, in the amount of 10 percent of the total bid. In lieu of the electronic bid bond, a cashiers check payable to the Transportation Commission of Wyoming

Award

Roads / Highways

$6,638,049.00

Public - State/Provincial

Paving, Site Work

95

3

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
9
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

June 9, 2025

Project location map

WY-387, Edgerton, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.