BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting, new construction and renovation of a mixed-use development in Fort Bragg, North Carolina. Working plans call for the construction of a day care center; for the renovation of a day care center; for site work for a day care center; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

PLA Survey for Project No. PN 97211 Construction of a Child Development Center, located at Fort Liberty, North Carolina. This survey is to address Project Labor Agreement (PLA) survey requirements for the project above. In accordance with EO 14063, effective 22 Jan 2024, which mandates that Federal Government agencies require use of PLAs for Federal construction projects estimate to be >$35M. This survey is for required market research IAW FAR 36.104(c) and UAI 5122.5. The target for this survey is General Contractors that are interested in bidding/proposing on these projects. If you have any questions related to the survey on this project, please contact: Contract Specialist Tatjana Fisher at tatjana.m.fisher@usace.army.mil or the Contracting Officer, Greg Graham at gregory.m.graham@usace.army.mil. Survey Link - https://forms.osi.apps.mil/r/uxB1Uy9g9c The survey will close 1 November 2024. Scope Summary - Construct a large standard design Child Development Center for children six weeks to five years of age with adjacent play areas for children and supporting facilities at Fort Liberty, North Carolina. The Child Development Center facility includes developmental learning modules, activity areas, an isolation room, changing areas, patron visitor waiting area, administrative support space, staff lounge, work rooms, commercial kitchen, laundry storage, supply room, information systems, fire protection and alarm systems, Electronic Security Systems (ESS), Fire and Life Safety (FLS) systems, and Utility Monitoring and Control Systems (UMCS) connection. Additionally, the facility includes outdoor play areas with age-appropriate child development equipment, safety surfacing, and fencing. Sustainability and energy enhancement measure are included. Supporting facilities for the Child Development Center include site development, utilities and connections, lighting, paving, parking, sidewalks, curbs, and gutters, bioretention areas, information systems, landscaping, and signage. Work will also include installation of video monitoring, alarm, and intercom systems for safety. Air conditioning will be provided by standalone chillers located adjacent to the facility. Measures in accordance with the Department of Defense Minimum Antiterrorism for Buildings standards will be provided. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.

Final Planning

Day Care Centers

$35,000,000.00

Public - Federal

New Construction, Outdoor Lighting, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
65
Bidding Soon
1,257
All Active Projects
475
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2024

img_map_placeholder

129 Globemaster Ave, Fort Bragg, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.