Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Arden, North Carolina. Completed plans call for the renovation of a educational facility.
Valley Springs Middle School Chiller Replacement. Work shall consist of furnishing all labor, taxes, materials, equipment, services, permits; incidental and implied; to install a complete and warranted retrofit system as designed per the attached drawings and specifications: Disconnect and remove the old chiller. The chiller shall be removed safely and shall not damage any of the building or grounds. If damage occurs, contractor shall be responsible for repairing back to original condition. Any tools/equipment needed for removal and re-installation shall be the responsibility of the contractor. The unit shall be disposed of properly, meeting all requirements established under section 608 of the Clean Air Act. Any required alterations to the equipment pad shall be the Contractors responsibility. Supply and install indoor water cooled Chiller per specifications. The design is based on Carrier Model 23XRV3232NQVAA50-. A BCS Operations Manager and/or Project Manager must be present and sign off on the new Chiller when delivered on site. All piping shall be supported in a sound mechanical means. All supports and brackets are to be galvanized or painted (2 coats) with a rust inhibiting paint. A 4x4 plate to be welded to the support, closed at the top and anchored to the pad. All installations must meet or exceed the printed manufacturer's recommendations. Code compliant as pertains to clearances, locations and accessories, etc. There shall be a thermometer and pressure gauge (with bleeder valves) on the inlet and outlet of the chiller piping. A drain (ball) valve shall be installed at the chiller barrel's lowest drain plug. The chiller barrel evaporator heads must be insulated on both ends. Power wiring, Service outlet, controls wiring, breakers, disconnects, conduit, motor starter change out/modifications and any other accessory needed to accomplish installation shall be the responsibility of the contractor and included as part of this project. Conduit must be in conduit EMT 3/4 inch minimum Chiller shall be BACnet capable Chiller is to control the primary and condenser pumps. Integration of the chiller BACnet with the ALC controls system, only to be performed by Harris integrated solutions as part of this contract. Contact: Chuck Still. (Phone: 828-707-6917). The Vendor shall hold the appropriate license of work to be performed and shall secure all permits required for the job completion, obtain, and deliver to Buncombe County Schools, all certification of inspection issued by the Authorities Having Jurisdiction. Time is of the essence. The contractor shall complete work on site within the allotted time. Liquidated damages shall be assessed for each calendar day beyond the substantial completed date in the amount of $300.00 per day. Liquidated damages shall be assessed for final completion beyond the final completion date in the amount of $100.00 per day. Submit Written Questions Vendor Wednesday, October 23, 2024 Provide Response to Questions BCS Thursday, October 24, 2024 Project shall be completed prior to August 10, 2025. Depending on equipment arrival, if project cannot be completed by August the project will have to start in the fall of 2025.
Sub-Bidding
Educational
$500,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2024
December 23, 2024
224 Long Shoals Rd, Arden, NC
Related To This Project
Arden, NC
--
Arden, NC
--
Arden, NC
--
Arden, NC
--
Arden, NC
--
Arden, NC
--
Arden, NC
Bid Date: Dec 20 2023
Arden, NC
Bid Date: Dec 20 2023
Arden, NC
Bid Date: Jan 05 2024
Arden, NC
--
Arden, NC
--
Arden, NC
Bid Date: Jan 06 2022
Arden, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.