BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2024 at 7:00 PM

Updated December 21, 2024

Site work for a water / sewer project in Hartselle, Alabama. Completed plans call for site work for a water / sewer project.

\ The Project includes the following Work: Primarily includes 3280 linear feet of Pipe bursting Existing 8" PVC Gravity Sewer with 12" IPS DR 17 HDPE Pipe and 2400 linear feet of 12" PVC Gravity Sewer installed by Open-Cut (Schedule 1). Also includes Pipe bursting at least 5,000 linear feet of Existing 8" Gravity Sewer and related ancillary work at various locations as determined and directed by the Owner (Schedule 2). All Work shall be Substantially Completed within two hundred forty (240) calendar days after the date when the Contract Time commences to run and ready for Final Payment two hundred seventy (270) calendar days after the date when the Contract Time commences to run. The attention of bidders is called to the provisions of State Law Governing General Contractors, as set forth in Title 34, Chapter 8, Article 1, Code of Alabama of 1975, as amended; and the provisions of said law shall govern bidders insofar as it is applicable. The above-mentioned provisions of the Code make it illegal for the Owner to consider a bid from anyone who is not properly licensed under such code provisions. In addition, bidders must carry the MU: Municipal and Utility Contractor classification as listed in the latest edition of the Roster of the State Licensing Board for General Contractors, Montgomery, Alabama. The Owner will not consider any bid unless the bidder produces evidence that they are licensed. All nonresident contractors preparing bids shall submit with their bid, evidence of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. The attention of nonresident bidders is called to the provisions of Alabama Law, Title 39, Chapter 3, Code of Alabama 1975, as amended, whereby In the letting of public contracts in which any state, county, or municipal funds are utilized, except those contracts funded in whole or in part with funds received from a federal agency, preference shall be given to resident contractors, and a nonresident bidder domiciled in a state having laws granting preference to local contractors shall be awarded Alabama public contracts only on the same basis as the nonresident bidder's state awards contracts to Alabama contractors bidding under similar circumstances; resident contractors in Alabama, are to be granted preference over nonresidents in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. estimated cost for this project is $3,000,000.00 to $3,400,000.00

Award

Water / Sewer

$3,144,545.00

Public - City

Site Work

15

16

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
14
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.