Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Foster City, California. Completed plans call for the renovation of a educational facility.
HVAC Replacement Phase III Project Brewer Island Elementary School 1151 Polynesia Dr. Foster City CA 9440 All prequalification questionnaires will be received until 4:00 P.M., October 30, 2024, through Quality Bidders using their web ling Any claim by a Bidder of error in its bid must be made in compliance with Public Contract Code 5100, et seq. Any bid that is submitted after this time shall be non-responsive and returned to the Bidder. The District is not responsible for Bids that are received after the deadline noted above. Security for its Bid, each Bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the San Mateo-Foster City School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. Bid period questions relative to the building projects are to be submitted to Mark Sherrill Sr. Construction Manager msherrill@smfc.12.ca.us and Metin Serttunc Cypress Engineering Group Metin@cypresseg.com The Districts Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful Bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no Bidder may withdraw its bid for ninety (90) days after the date of the bid opening. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible Bidder based on: The base bid amount only. Based on a process that conceals the identity of Bidders from the District until the bids have been ranked. Bid period questions relative to the building projects are to be submitted to Mark Sherrill Sr. Construction Manager msherrill@smfc.12.ca.us and Metin Serttunc Cypress Engineering Group Metin@cypresseg.com The Districts Board has found and determined that the following item(s) shall be used on this Project based on the purpose(s) indicated here. (Public Contract Code 3400.) A particular material, product, thing, or service is designated by specific brand or trade name for the following purpose(s): In order to match other products in use on a particular public improvement either completed or in the course of completion. Door Hardware (Schlage) Energy Management System (Delta) Fire Alarm System (Notifier) Brewer Island replacement of existing HVAC units and replacement of new switchgear
Sub-Bidding
Educational
$300,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2024
December 23, 2024
1151 Polynesia Dr, Foster City, CA
Related To This Project
Foster City, CA
Bid Date: Oct 10 2024
Foster City, CA
Bid Date: Sep 17 2024
Foster City, CA
Bid Date: Aug 06 2024
Foster City, CA
--
Foster City, CA
Bid Date: Jun 27 2024
Foster City, CA
Bid Date: Jun 13 2024
Foster City, CA
--
Foster City, CA
Bid Date: May 17 2024
Foster City, CA
--
Foster City, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.