BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in San Mateo, California. Completed plans call for the renovation of a educational facility.

HVAC Replacement Phase III Project Question Deadline 11/14/2024 Questions received less than SEVEN (7) calendar days prior to the date for opening Bids may not be answered. Bid period questions relative to the building projects are to be submitted to Mark Sherrill Sr. Construction Manager msherrill(â)smfc.l2.ca.us and Metin Serttunc Cypress Engineering Group Metin@cypresseg.com Highlands Elementary School 2320 Newport St San Mateo, CA 94402 All prequalification questionnaires will be received until 4:00 P.M., October 30, 2024, through Quality Bidders using their web ling Any claim by a Bidder of error in its bid must be made in compliance with Public Contract Code 5100, et seq. Any bid that is submitted after this time shall be non-responsive and returned to the Bidder. The District is not responsible for Bids that are received after the deadline noted above. Security for its Bid, each Bidder shall provide with its Bid form a bid bond issued by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the San Mateo-Foster City School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. Bid period questions relative to the building projects are to be submitted to Mark Sherrill Sr. Construction Manager msherrill@smfc.12.ca.us and Metin Serttunc Cypress Engineering Group Metin@cypresseg.com The Districts Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful Bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no Bidder may withdraw its bid for ninety (90) days after the date of the bid opening. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible Bidder based on: The base bid amount only. Based on a process that conceals the identity of Bidders from the District until the bids have been ranked. Bid period questions relative to the building projects are to be submitted to Mark Sherrill Sr. Construction Manager msherrill@smfc.12.ca.us and Metin Serttunc Cypress Engineering Group Metin@cypresseg.com The Districts Board has found and determined that the following item(s) shall be used on this Project based on the purpose(s) indicated here. (Public Contract Code 3400.) A particular material, product, thing, or service is designated by specific brand or trade name for the following purpose(s): In order to match other products in use on a particular public improvement either completed or in the course of completion. Door Hardware (Schlage) Energy Management System (Delta) Fire Alarm System (Notifier) The successful Bidder and its subcontractors shall pay all workers on the Project not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to Labor Code 1770 et seq. Prevailing wage rates are on file with the District and are available to any interested party on request or at website

Sub-Bidding

Educational

$300,000.00

Public - County

Renovation

28

12

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
48
Bidding Soon
1,654
All Active Projects
717
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

December 23, 2024

img_map_placeholder

2320 Newport St, San Mateo, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.