Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a civil project in Seligman, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
040 YV 107 Kingman - Ash Fork Hwy (I-40) (Markham Wash to Seligman TI EB) The proposed project is located in Yavapai County on I-40, Markham Wash to Seligman TI between milepost 107.7 to milepost 122.7. The works consists of I-40 eastbound pavement rehabilitation by milling the existing pavement and replacing it with a new asphaltic concrete and stone matrix asphaltic concrete. The work also includes replacing existing guardrail and guardrail end terminals, install pipe and pipe lining, end sections, seal existing bridge deck with methacrylate, replace bridge deck joint seal, bridge steel crack repair, install elastomeric bearings assembly, replace bridge deck joints, culvert spall repair, signing, pavement marking and other related work. NorthWest District Item # 104409 Engineering Specialist: Vian Rashid Question Deadline 03/31/2026 The Department May Not Answer All Questions, and Any Decision on Whether a Question is Answered Will Be Within the Sole Discretion of the Department. Any Questions Received Less Than Three Working Days Prior to The Bid Opening Date May Not Be Answered. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. AZDOT - Pavement Rehabilitation (I-40)
Bid Results
Roads / Highways
$17,985,969.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2026
June 2, 2026
I-40, Seligman, AZ
Related To This Project
Seligman, AZ
--
Seligman, AZ
--
Seligman, AZ
--
Seligman, AZ
--
Seligman, AZ
Bid Date: Aug 08 2025
Seligman, AZ
Bid Date: Jun 14 2023
Seligman, AZ
Bid Date: Jan 26 2023
Seligman, AZ
Bid Date: Jan 05 2023
Seligman, AZ
Bid Date: Nov 17 2022
Seligman, AZ
Bid Date: Oct 27 2022
Green Valley, AZ
--
Tempe, AZ
--
Kayenta, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
