BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Cary, North Carolina. Completed plans call for the renovation of a educational facility.

Replacement of Highcroft Elementary School Building Automation System Replacement project. Minority and women-owned businesses are encouraged to participate. Question Deadline 11/01/2024 Every request for such interpretation should be in writing addressed to the Design Consultant with a copy forwarded to the Owner General Notes: 1. New BAS system will be utilizing Bacnet/Lon Protocol with a Tridium based platform as per WCPSS design guidelines. 2. New JACE 8000's shall have the latest version of Niagara N4 installed 3. All JACE's shall have workbench embedded in them. 4. This project will have a $20,000 contingency included in the bid price as a line item. 5. As per specification WCPSS shall have the ability to program and modify the field controllers remotely, contractor shall include this in their base bid if required. 6. All work contained to the mechanical rooms may be done during occupied hours, as long as it is not disruptive to staff/students. All reasonable efforts shall be made to minimize system downtime. All shutdowns must be coordinated with school staff. 7. All work outside of the mechanical rooms (e.g. running new comm. link, controllers in classrooms/hallways, thermostats etc...) must be completed during unoccupied hours. 8. Contractor is responsible for all clean up, protection, patching, fire stopping and repair/replacement of any damaged material such as ceiling tiles, ceiling grid, etc... 9. All commissioning and functional testing with third party commissioning agent shall be included in this contract and consist of all procedures outlined in the design guidelines and commissioning procedures. 10. Contractor shall verify all new and existing devices to remain are calibrated and operating properly. 11. Contractor Shall Verify all existing site conditions in coordination with the mechanical and controls As-Builts. Contractor shall walk the site prior to the submittal of bid to verify all equipment, components and sensors will be properly integrated into the new BAS system under the base contract bid. The intent of this project is to provide a 100% complete BAS system with all existing equipment and components. WCPSS is not responsible for any missing control or mechanical as-builts and will not entertain any change order for equipment that is not shown properly on the existing documentation. 12. Contractor shall include 4 hours of training to the owner as part of this contract. 13. Contractor shall furnish and install a new Type 1 NEMA wall mounted enclosures for all controllers except VAV controllers. New enclosures shall include new wire duct & cover equal to Panduit type F/NE and an enclosure perforated panel for mounting of controller. 14. Refer to section 3.7 Permits, Fees and Notices in the General Conditions for payment of permits and other fees. 15. Contractor shall perform all work in accordance with all federal, state and local codes and regulations. The project consists of providing and installing all necessary material and labor for a complete and operational building automation system (BAS) as described in the written scope of work sheets and design guidelines The Wake County Public School System reserves the right to reject any and all bids.

Post-Bid

Educational

$355,000.00

Public - County

Renovation

74

8

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
51
Bidding Soon
1,157
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.