Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Oklahoma City, Oklahoma. Contact the soliciting agency for additional information.
ANNUAL PROJECT SYNOPSIS Annual Synopsis: An Annual MACB Synopsis is hereby published as follows: For all projects: the contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to SET UNIT AND SEAL AROUND CURB, B1 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR & REPLACE STANDBY GENERATOR FOR B117 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000 The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to WIDEN SHOULDERS OF TAXIWAY C at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR BASKETBALL COURT, BLDG 5520 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR EDGING ALONG TAXIWAY AND APRON EDGES at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REMOVE OVERHEAD PNEUMATIC LINE, B3001 ANNEX G at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR DUCT SYSTEM, B3001 POST AH70H at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to CONTROL ACCESS TO VALVES WITH FENCE, B96001 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed in FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR/REPLACE MAIN DISTRIBUTION & BRANCH PANEL BOARDS, B6002 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE ADA TURNSTILE, B230 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE DETERIORATED STEPS, B3001, DOOR G at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $100,000 and $500,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE UNIT SUBSTATION & SWITCHGEAR, COL V51, BLDG 3001 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE RESTROOMS, POST CY AND 2C7, B2121 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR PAVEMENT TO FOUNDATION, B260 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to PERFORM STUDY TO DETERMINE SECURITY REQUIREMENTS, B62516 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to INSTALL MNS & REPLACE HEAT DETECTORS, B976 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE AREAS FOR 72ABW/CVB, B1 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE VAULT AND FUEL TANK, B1032 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE VAULT AND FUEL TANK, B3202 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to SUSTAIN REPAIR GENERATOR, B988 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE RESTROOMS, B 117 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR STRUCTURAL DISPLACEMENTS, B989 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR OVERHEAD DOORS, FIRE STATION, BLDG 989 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR INSTALL ADA ELEVATOR IN B510 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR VEHICLE EXHAUST SYSTEM, B1130 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR LADDER SYSTEM, B3001 COL AA67 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE EXTERIOR WINDOWS, B416, DOOR 21 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $500,000 and $1,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to RENOVATE STRIPING PLAN FOR ALC RAMP, B51117 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FACILITY HVAC CONTROL SYSTEM, B2122 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE BLOWERS WITH WALL FAN BLOWERS, FAN DECK 8S, B3001 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR TRANSFORMER VAULT 6, BLDG 9001 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPLACE CHILLER SERVING BEARING SHOP, BLDG 3001 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE SUPPRESSION SYSTEM, MAINT HANGAR B2280 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to DEMO UTILITY PITS OC-ALC AIRCRAFT APRON, B51117 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR HVAC DIFFUSER AND DUCTOWRK, B3001 POST P51-R59 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR DUCTWORK, POST P-39, B3001 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REHAB TANKS 62501E & 62501W at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR STORM DAMAGED FACILITY, B5922 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to INSTALL NEW GENERATORS BUILDING 820 AND 825 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $1,000,000 and $5,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR BY REPLACEMENT 4 UNIT SUBSTATIONS, B3221 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR FIRE SUPPRESSION SYSTEM, MAINT HANGAR B2136 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000. The contractor shall provide all labor, tools, material, equipment, testing, personal protective equipment, transportation and other incidentals necessary to REPAIR CHILLER, B3221 at Tinker Air Force Base (TAFB), Oklahoma. As prescribed by FAR 36.204 and DFARS 236.204 the magnitude of construction for this project is estimated between $5,000,000 and $10,000,000 Prospective contractor responses shall include the three attachments below completed in their entirety. All attachments are required by the COB 1 November 2024. Attachment 1: Experience Matrix Attachment 2: MACB Provision and Clause Matrix Attachment 3: Section A_ Executive Summary All questions on the BOA Invitation, Statement of Work (SOW), and additional attachments, for the BOA requirement should be sent directly to the Contracting Officer via email at sara.hinds.2@us.af.mil and the Contract Specialist via email at megan.hardeman@us.af.mil. Please use the following email subject line: BOA FA8137-21-R-0022 RFP Questions. Questions are due by COB 22 October 2024 The Method of Contractor Selection has not been determined at this Time.
Final Planning
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2024
Multiple Locations, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Oct 29 2024
Oklahoma City, OK
Bid Date: Oct 23 2024
Oklahoma City, OK
Bid Date: Nov 20 2024
Oklahoma City, OK
Bid Date: Oct 30 2024
Oklahoma City, OK
Bid Date: Sep 16 2021
Oklahoma City, OK
Bid Date: Jun 30 2021
Oklahoma City, OK
Bid Date: May 19 2021
Oklahoma City, OK
Bid Date: Nov 18 2020
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Nov 07 2024
Oklahoma City, OK
Bid Date: Nov 20 2024
Oklahoma City, OK
Bid Date: Nov 12 2024
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Nov 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.