BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and paving for a mixed-use development in Kingman, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

093 MO 048 093-A-(210)T Hoover Dam-Kingman Hwy (US-93) (Sanctuary Rd - I-40) The proposed project is located in Mohave County on US 93 near Kingman, between MP 48 and MP 71.40. The proposed work consists of pavement rehabilitation. The work includes mill and fill of existing asphaltic concrete of roadway mainline, shoulders, and milled asphalt concrete treatment at designated paved and unpaved median crossovers. The work also includes ADA upgrades to current standards, bridge repair comprised of deck overlay and sealant, expansion joint replacement, bridge barrier replacement, removing and replacing guardrail, applying pavement marking, installing ground-in rumble strips, and other related work. Northwest District Item # 103126 Engineering Specialist: Yusuf Kadem The time allowed for the completion of the work included in this contract will be 380 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 6.26 The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. AZDOT - Pavement Rehabilitation - US 93 Question Deadline 07/29/2025- The Department may not answer all questions, and any decision on whether a question is answered will be within the sole discretion of the Department. Any questions received less than three working days prior to the bid opening date may not be answered.

Bid Results

Roads / Highways

$41,781,775.00

Public - State/Provincial

Paving, Site Work

158

4

103

8

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
33
Bidding Soon
334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

November 4, 2025

Project location map

US-93, Kingman, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.