Site work for a water / sewer project in Vancouver, British Columbia. Completed plans call for site work for a water / sewer project.

Rehabilitation of the New Westminster Sanitary Sewer Interceptor - Annacis Section: Rehabilitation at Site 1. The Corporation is planning to rehabilitate Site #1 of to New Westminster Interceptor, Annacis Section (NWA), a major sanitary sewer interceptor. The proposed rehabilitation at Site #1 including approximately 200 m reinforced box interceptor is located adjacent to and outside of the Annacis Island Wastewater Treatment Plant on Derwent Way and Derwent close. The NWA, constructed in the 1970s, consists of cast-in-place concrete box culvert sections with exterior dimensions of approximately 3 m in height and 3.65 m in width, located about 2.5 m below ground level, as shown in the schematic view in Figure 1. The top slab reinforcement is understood to be in a severely deteriorated condition, and an additional structural top slab is required. There is also the possibility of partially covering the walls with a reinforced concrete layer. During construction, if degradation of the interceptor wall system is noted, a full jacketing or local repair may be considered based on the Project Engineer of Record's (EOR) new design. In the case of full-height excavation of the interceptor, the Cutter Soil Mixing (CSM) shoring method may be used to minimize potential settlement, subject to EoR approval. The main scope of work includes providing construction services and coordinating with existing utilities such as the City of Delta, FortisBC, BC Hydro, and Telus. Coordination will involve utility relocations to support the interceptor rehabilitation work. The utility relocation plan will be provided, and the contractor will work closely with utility owners by hiring subcontractors approved by the utility owners, if necessary. It should be noted that the concrete interceptor is located in a congested area with the Corporation's other assets, including but not limited to the outfall interceptor. The rehabilitation of the outfall interceptor is not included in the scope of this work. Documents can be obtained from https://metrovancouver.bidsandtenders.ca/ Question Deadline: Tue Nov 12, 2024 12:00:00 PM (PST) Duration in months: 10

GC Bidding

Water / Sewer

$1,000,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
47
Bidding Soon
1,450
All Active Projects
604
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

March 1, 2025

img_map_placeholder

Multiple Locations, Vancouver, BC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.