Published November 25, 2024 at 7:00 PM

Updated May 10, 2025

Site work for a water / sewer project in Aberdeen, South Dakota. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Construction of a 30-inch diameter potable water main in Edmunds County, South Dakota. The water main construction consists of about 45,000 linear feet of 30-inch steel or fiberglass water main installed by open excavation methods, fittings and restraints, concrete thrust blocks, highway crossings with jack & bored 36" and 48" casing pipe, isolation valves, combination air valve vaults, cathodic protection system, erosion control, seeding & restoration, pressure testing & disinfection, cleanup, traffic control, startup services, and all other miscellaneous work required not herein mentioned but inferred from the construction Contract Documents. Of the total 45,000 linear feet of water main, about 24,000 linear feet are comprised of three (3) Bid Alternates. All bids must be accompanied by a Bid security. Bid security will take the form of a bid bond in an amount of ten percent (10%) of the Bidder's maximum Bid price or a cashier's or certified check made payable to Owner in an amount of five percent (5%) of the Bidder's maximum Bid price. The Bid security will be retained by the Owner if the successful bidder refuses or fails to enter into an Agreement within fifteen (15) days after Notice of Award or fails at time of executing the contract to furnish a construction performance bond and construction payment bond guaranteeing the faithful performance of the work. The Bidder to whom the contract is awarded will be required to furnish a construction performance bond and a construction payment bond to the Owner in the amount of one hundred percent (100%) of the contract award for each bond, in conformance with the requirements of the Contract Documents. The construction performance bond and construction payment bond shall remain in full force until the completion of the Contract as specified in the General Conditions. WEB Water reserves the right to reject any or all bids. ARPA Grant #2023G-ARP-200 DISADVANTAGED/MINORITY BUSINESS ENTERPRISES 1% WOMEN'S BUSINESS ENTERPRISE 4% Question Deadline 11/12/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer and Owner in writing. Engineer will answer all questions. Contact information and submittal procedures for such questions are as follows: A. To Engineer Via Email: bryanl@bannerassociates.com B. To Owner Via Email: sphillips@webwater.org. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results : Sch. 1: : SJ Louis Companies $8,902,797.74* Sch. 2: SJ Louis Companies $8,760,429.74*

Bid Results

Water / Sewer

$17,663,227.00

Public - County

Site Work

101

25

25

7

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
4
Bidding Soon
163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

January 20, 2025

Project location map

Multiple Locations, Aberdeen, SD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.