BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2024 at 8:00 PM

Updated October 19, 2024

Site work for a water / sewer project in Des Moines, Washington. Conceptual plans call for site work for a water / sewer project.

Phase I of this project would remove 500 feet of rock armoring near the mouth of Des Moines Creek and along shoreline areas adjacent to Des Moines Beach Park in order to restore natural beach slopes and allow natural sediment beach feeding from the shoreline bluffs north of the park. The stream channel would be re-constructed for a length of 25 to 50 feet. The stream mouth area would be planted with riparian and marsh vegetation. Phase II includes the removal of 250 feet of rock armoring and potential removal of the concrete seawall leading from the south side of the creek mouth to the marina. As of October 18, 2024, this project is included in the city's 2024-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$1,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
112
Bidding Soon
1,701
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

To Be Determined, Des Moines, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.