Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Stephens City, Virginia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Introduction Frederick Water invites qualified firms to submit their qualifications (SOQs) for a design-build project to provide advanced treatment at the Henry F. Sliwinski (HFS) WTP. The HFS WTP receives raw water from two quarry pits, Pit 2 and East Pit. Frederick Water has developed the East Pit quarry and raw water pump station to provide both water supply and drought storage Due to TDS and sulfate levels in the East Pit raw water, advanced treatment will be required to comply with drinking water standards. The objective of this project is to implement innovative and efficient treatment technologies for production of high- quality drinking water according to the requirements set forth in this RFQ. Project Scope Frederick Water recently constructed the Henry F. Sliwinski (HFS) Water Treatment Plant, an 8 MGD microfiltration water treatment plant. Water stored in Carmeuse Lime and Stone quarry pits, Pit 2 and East Pit (also referred to as Pit 4), on adjacent properties is pumped to the facility for treatment. Due to high TDS and sulfate concentrations in the raw water from the East Pit, the WTP will require additional treatment to provide water that meets secondary drinking water quality standards. Frederick Water has reviewed available treatment technologies and selected nanofiltration or reverse osmosis (NF/RO) membranes as the preferred treatment technology to reduce effluent TDS and sulfate concentrations in the drinking water and achieve compliance with the SDWA Secondary Standards. Frederick Water projects that maximum day system-wide demands will range between 15 and 19 MGD within a 20 year planning horizon. The HFS WTP is anticipated to meet approximately 11 MGD of those demands. Frederick Water intends to use the existing 8 MGD microfiltration system to meet short term demands, and it is designed for expansion to 12 MGD as demand requires. Frederick Water has completed a treatability study that indicates pre-filtration will be required due to particulate levels in the East Pit raw water. This will require Pit 2 and East Pit raw water to be blended, treated with the existing microfiltration membranes and then treated with the NF/RO membranes. Preliminary testing also indicates that additional pretreatment may be required due to the organic fouling potential of the raw water. Project Schedule It is anticipated that the Progressive Design-Build Contract will be executed on or about March 21, 2025. The design, permitting, construction, and performance testing of the completed Project are expected to be completed no later than April 9, 2027. Deadline for questions November 11, 2024; 5 pm Inquiries and questions should be addressed to: chenry@frederickwater.com. Envelopes must include the name and address of the Respondent. Respondents must submit five paper copy sets of the proposal along with one digital copy. The Frederick Water reserves the right to reject any and all Statement of Qualifications.
Post-Bid
Water / Sewer
$400,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2024
March 21, 2025
To Be Determined, Stephens City, VA
Related To This Project
Stephens City, VA
Bid Date: Dec 27 2024
Stephens City, VA
Bid Date: Oct 11 2024
Stephens City, VA
--
Stephens City, VA
--
Stephens City, VA
--
Stephens City, VA
Bid Date: May 15 2024
Stephens City, VA
Bid Date: May 29 2024
Stephens City, VA
Bid Date: May 23 2024
Stephens City, VA
Bid Date: Apr 12 2024
Stephens City, VA
Bid Date: May 02 2024
Stephens City, VA
Bid Date: Mar 27 2024
Stephens City, VA
--
Stephens City, VA
--
Stephens City, VA
--
Stephens City, VA
Bid Date: Dec 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.