Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a playground / park / athletic field in Indianapolis, Indiana. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
https://www.archpaper.com/2024/11/white-river-state-park-addition-david-rubin-land-collective/ White River State Park addition by DAVID RUBIN Land Collective and REA starts construction in Indianapolis Construction has begun on a major $65 million expansion to Indianapolis’s White River State Park, smack dab in the middle of downtown, where a sea of automotive manufacturing factories used to be. The project is by DAVID RUBIN Land Collective of Philadelphia and Indiana-based Rundell Ernstberger Associates (REA). The expansion adds another 13 acres to an urban living room that, today, measures 267 acres. It’s happening next to a former General Motors stamping plant atop a critical levee. Designers noted that the expansion both adds wiggle room to the park and helps safeguard Indianapolis, Indiana from flooding. It calls for multiple event pavilions, including a new theater with a backdrop of the city’s skyline. The elevated platform will straddle the sloped embankment. A new river beach will elongate the existing 5-mile White River Trail. These accessories will connect to neighboring communities, namely the Valley and Westside neighborhoods, and the city’s growing Innovation District tech and research hub, architects shared. There will also be a connection to the new Henry Street Bridge, added Daniel Liggett, a partner and project lead at REA. David Rubin, founder of DAVID RUBIN Land Collective, said in a statement, “This new landscape addition will offer the people of Indianapolis, the State of Indiana, and their visiting friends a new perspective of the White River, which is the extraordinary natural feature that informs so much of the State’s character. In this project, infrastructure, rejuvenated riparian ecology, and year-round experience are seamlessly integrated to inform identity.” The role of the levee in this project can’t be emphasized enough. The critical infrastructure, government officials noted, cannot under any circumstances be compromised. So designers worked closely with Indianapolis Department of Public Works, the Indiana Department of Natural Resources, and other agencies to ensure the addition is up to snuff, and will not create complications. The project also possesses a broader historical component, designers shared. Indianapolis’s park and boulevard system was ideated by George Kessler in 1913. The new addition to White River State Park helps manifest Kessler’s vision, which was offering “open spaces, providing recreation and fresh air for all.” DAVID RUBIN Land Collective first got involved in the project in 2019, when it participated in the White River Master Plan. The office then paired up with REA and White River State Park Development Commission to develop strategies based on three factors: river infrastructure, ecological rejuvenation, and social impact. The expansion is slated for completion next year. ---------------------- https://www.insideindianabusiness.com/articles/white-river-state-park-reveals-plans-for-65m-expansion-on-stamping-plant-site White River State Park reveals plans for $65M expansion on stamping plant site INDIANAPOLIS - The leaders of White River State Park are finalizing design plans for a $65 million extension of the park across Washington Street to the former General Motors stamping plant site where Elanco Animal Health is building a new headquarters. The park will expand into 15 acres between the White River and the Elanco project and will occur over two phases. The first—covering the northern 7.5 acres of the property—is expected to include an event pavilion to be developed inside the remnants of a former crane bay that had been part of the original stamping plant. Gov. Eric Holcomb, Indianapolis Mayor Joe Hogsett, and White River State Park Executive Director Jake Oakman will join other officials to break ground on the project Tuesday morning. The first phase will also feature new greenspaces, a theater and a promenade overlooking the White River, along with a new set of limestone stairs within the levee that will lead to a new overlook offering panoramic views of downtown Indianapolis. The White River State Park Commission, which manages the 250-acre park’s operations on behalf of the state, has been considering what could be done with the land since late 2020, when the Indiana Economic Development Corp. announced it would set aside at least 10 acres for the park as part of a deal to relocate Greenfield-based Elanco to the site. The IEDC is working with Elanco and Purdue University to develop a tech park called the OneHealth Innovation District on part of the former stamping plant site. To make the most of the site, the state plans to reroute White River Parkway South so it runs along the western edge of the new park property, closer to the Elanco site. That will free up more land along the river for recreation. The road will cut between the Elanco headquarters building and the former crane bay, which will be named Kahn Pavilion in honor of Detroit industrial architect Albert Kahn, who helped design the GM facility nearly a century ago. “When we were factoring in what to consider for this first phase of the expansion, our big goals were to try and preserve a big part of the state’s history while also engaging with the White River itself,” said Oakman. “We wanted to do something that would make sense for where the overall development of the [OneHealth] innovation district is at this point, then let the rest of the park property sort of grow as the GM site gets further developed and as The Valley neighborhood continues to grow,” Oakman said, referring to a neighborhood that borders the stamping plant property. The state plans to spend $35 million on the project, with an additional $30 million pledged by Indianapolis-based Lilly Endowment Inc., Oakman said. He declined to say how the state plans to pay for its share of the project. The endowment’s investment is in addition to a grant the endowment is providing for the city’s construction of a bridge extending Henry Street and the Indianapolis Cultural Trail from the east side of the White River to the former stamping plant site. The bridge, which the city started working on last month, will offer drivers, pedestrians and riders easier access to the White River State Park expansion. Construction timeline Oakman said the park commission has published the first construction bid packages for consideration, with responses due this month. He said construction on the levee portion of the project is expected to start by the end of this year and take about 12 months to build. Construction on the remaining parts of the first phase, including Kahn Pavilion, are expected to start in spring 2025 and take 14 to 18 months to build. When completed, the pavilion will be available for weddings, corporate events and community gatherings of up to 500 people but will be open to the public on most days. Park officials anticipate the building, which will have large retractable doors and a cafe, will be able to accommodate stalls for farmers markets, yoga classes and seminars. “We think it’s going to be a real attractive element to the park and something we don’t have right now in our portfolio of park elements,” said Adam Theis, associate vice president of capital planning for Indiana University and chair of the commission’s design committee. “There’s a myriad of opportunities for activities that are relevant to the White River State Park mission and also very attractive for people around the state to come and bring conventions, gatherings and festivals.” The area left when White River Parkway is moved will be filled with a large promenade that acts as an artery for the expansion, with an entrance from Henry Street. The commission is also planning a second, smaller pavilion space, terraced seating and a pair of nature-focused areas called a hill scramble and an adventure bluff, which will flank either end of the expansion. Trails are expected to run throughout the expansion, as well. No watercraft access One thing the expansion won’t offer is a launch point for kayaks or boats, despite initial interest in locating access points at the site. Oakman said the project will create an opportunity for visitors to “engage the river,” but he said the proximity of a low-head dam nearby makes launching watercraft from the area a challenge. “We would like to see people safely engaged in the river, but one of the considerations for not having a defined canoe launch is the dam north of this site,” he said. “There’s some issues with how the water comes off the dam, and we want to make sure people are being safe.” Low-head dams allow water to flow continuously over a crest. But when water levels rise downstream, they can produce upstream currents capable of trapping someone who is on the water swimming or in a kayak or other boat. The dams are often referred to as “drowning machines.” Despite the lack of a launch point, Oakman said he expects the park will draw 50 to 100 people a day, a number that could swell to hundreds or thousands on nice days or during special events. The northern portion of the expansion will have 65 to 85 dedicated parking spaces to accommodate daily traffic. The southern portion of the expansion could be used for overflow parking, Oakman said. Visitors could also park along White River Parkway. The plans for expanding the state park come about one year after a group of 26 local leaders visited the $1 billion Gardens by the Bay nature park development in Singapore, which encompasses 250 acres near the country’s southern coast. The tourist attraction fronts 3.2 miles of coastline along the Singapore Strait. Local leaders were looking to learn about how central Indiana could better utilize land adjacent to the White River. Theis said the White River State Park expansion plans incorporate ideas from the trip but don’t replicate any one part of the Singapore site. “We think this is a first phase … a significant action step to engaging the river and engaging it right next to one of our biggest and most important corporate partners in Elanco,” Theis said. “This becomes an outcome that is directly related to not just preserving our own cultural heritage, but it’s about new and exciting things that are going on in our economy.” ---------------------------------------------------------------------------------- Owner will receive emailed lump sum bids Bidders' Questions: All bidder questions shall be submitted in writing to Daniel Liggett at REA. dliggett@reasite.com. Questions will be answered via Addenda only. All questions must be issued via email to Daniel Liggett by, October 11, 2024, at 3:00pm. A final addendum is expected to be issued by October 14, 2024. Project Location: 250 White River Parkway, Indianapolis, Indiana 46222 Site pavements, veneer walls, overlooks, foundations, electrical, sewer utility installation, site pavements, and landscaping per construction documents. Bids shall be accompanied with a certified check made payable to White River State Park Development Commission or an acceptable Bidders Surety Bond in a specific amount not less than 5% of the Base Bid. Owner reserves the right to reject any and all Bids and waive any and all informalities, whether or not the Bids comply with the prescribed requirements. The Owner may consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the work for which the identity of subcontractors and other persons or organizations must be submitted as specified in the "Information for Bidders". It may conduct such investigations as it deems necessary to establish the responsibility, qualifications and final ability of the bidders, proposed subcontractors, and other persons and organizations to do the work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time. The owner reserves the right to reject the Bid of any, or all, Bidder(s). The successful Bidder shall furnish to the Owner an approved one hundred percent (100%) Performance Bond (Indiana Form 86A). This bond shall remain in effect for twelve (12) months from the date of final acceptance of the work. The Owner reserves the right to reject any or all Bids, and to waive any technicalities relative to bidding.
Post-Bid
Playgrounds / Parks / Athletic Fields
$400,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2024
November 20, 2024
250 White River Pkwy Dr, Indianapolis, IN
Related To This Project
Indianapolis, IN
Bid Date: Nov 21 2024
Indianapolis, IN
Bid Date: Nov 07 2024
Indianapolis, IN
Bid Date: Oct 24 2024
Indianapolis, IN
Bid Date: Nov 12 2024
Indianapolis, IN
Bid Date: Nov 07 2024
Indianapolis, IN
Bid Date: Nov 14 2024
Indianapolis, IN
Bid Date: Nov 22 2024
Indianapolis, IN
Bid Date: Oct 24 2024
Indianapolis, IN
Bid Date: Dec 03 2024
Indianapolis, IN
Bid Date: Nov 08 2024
Indianapolis, IN
--
Indianapolis, IN
Bid Date: Nov 08 2024
Indianapolis, IN
Bid Date: Nov 22 2024
Indianapolis, IN
Bid Date: Nov 12 2024
Indianapolis, IN
Bid Date: Nov 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.