BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Northlake, Illinois. Completed plans call for the renovation of a library.

As of November 20, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Question Deadline 11/18/2024 at 3:00 PM CT Questions must be submitted in writing to the Library by email to lbartnik@northlakelibrary.org o Replacement of one 40-ton York rooftop unit (serves 2nd floor) o Replacement of one 60-ton York rooftop unit (serves 1st floor) o Replacement of three (3) ductless split systems serving dedicated spaces o All work to be performed during normal working hours that are Monday through Friday from 7:00 am to 3:30 pm excluding holidays unless otherwise specified within this proposal. Work required beyond normal working hours will incur a premium time labor charge unless other provisions have been agreed upon. o Any work found necessary other than what is outlined and approved within this proposal will be completed on a time and material or quoted basis and invoiced accordingly. o Permits and permit drawings are not included. o All applicable sales tax has been excluded, proof of tax exemption will be provided with signed contract. The proposed scope of work includes the following Provide all necessary stamped engineering drawings for HVAC and controls work. Secure all necessary permits required by the City of Northlake. Provide all necessary Project and Construction Management and coordinate all site activities associated with the project. Provide off-site storage of equipment with a maximum storage time of six months. Provide floor protection for staging and hallway work areas. Areas used for staging to store and prep new equipment prior to installation will be coordinated with the district prior to the start of construction. Provide off-site disposal for demolished HVAC equipment. Provide necessary technical check-out, factory start-up, commissioning and testing of new equipment to ensure proper operation. Provide project close-out paperwork including warranty letters, as-built drawings and Operations and Maintenance manuals on all new equipment. Provide removal and reinstallation of ceilings as required for associated piping, sheet metal and electrical work. Ceiling tile damaged during construction will be replaced. The new ceiling tile will conform to the district standard. Equipment selections to be submitted to the library prior to equipment and material order. Existing HVAC equipment not listed below will remain and be reused. Existing fire alarm, life safety, AV, IT, and sprinkler systems will remain. Modifications, upgrades, or replacement of existing fire alarm, life safety, AV, IT, and sprinkler systems is not included in scope.

Bid Results

Library

$336,259.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
89
Bidding Soon
1,788
All Active Projects
773
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2024

December 18, 2024

img_map_placeholder

231 N Wolf Rd, Northlake, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.