BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Victoria, British Columbia. Completed plans call for site work for a water / sewer project.

The works and requirements under this Contract generally include, but are not limited to, the following. 1.Highland Fernwood Water Treatment Plant: a) Identify, list and follow all relevant specification, regulation and codes of practice for the following: b) Investigate and design a new safety railing to replace existing chain at loading area of the treatment plant. c) The new safety rail shall be removable in order to allow for use of the loading area. Design with a height not less than standards as per BCBC 2024 or the latest. d) Submit design and/or drawings to CRD for review and approval. e) Supply and Installation of new H20 load rated safety rail. f) Ensure the compliance with Building Code (BCBC 2024), WorkSafe BC regulations. g) Tidy up and make good any disturbances to ground or structure on public or private property 2. Fernwood Reservoir a) Identify, list, and follow all relevant specification, regulation and codes of practice for the following: b) Investigate and design new access ladder with adequate bracing and roof top guardrails. c) Submit design and/or drawings to CRD for review and approval. d) Remove the existing roof access ladder and guardrails. e) Supply and Install Ladder, and Guardrails around the perimeter of the reservoir’s roof, according to Building Code (BCBC 2024) and latest OHS Standards and regulations. f) Provide any and all required scaffolding necessary to perform work. Erect scaffolding independent of walls. Construct, maintain and use scaffolding in accordance with CAN/CSA-S269.2M. g) Provide any and all required hoisting equipment for removal of existing structure and placing of materials and equipment during construction. h) Ensure compliance with all the regulations regarding welding and cutting or any operations that generate sparks, flames, smoke and heat. i) Tidy up and make good any disturbances to ground or structure on public or private property. 3. Fulford Water Treatment Pump Station: a) Identify, record and follow all relevant specification, regulation and codes of practice for the following: b) Investigate and design safety guardrails around the working platform of Fulford Water System Pump Station at Sunnyside Dr. c) Submit design and/or drawings to CRD for review and approval. d) Supply and Install guardrails around the perimeter of working platform according to Building Code (BCBC 2024) and latest OHS Standards and regulations. e) Ensure compliance with all the regulations regarding welding and cutting or any operations that generate sparks, flames, smoke and heat. f) Tidy up and make good any disturbances to ground or structure on public or private property. 4.1 Salt Spring Island Multi Space Facility (in conjunction with item 4.2 below): a) Identify, record and follow all relevant specification, regulation and codes of practice for the following: b) Investigate and design safety guardrails at the first-floor roof level close to northeast entrance. c) The new safety rail shall be permanent in order to safely work on the roof edges, Design with a height not less than standards as per BCBC 2024or the latest. d) Submit design and/or drawings to CRD for review and approval. e) Apply for Building Permit; submit design and drawings to CRD SSI Building Inspection Team, fees, attend to any follow up building permit requirements provide correspondence and documentation as required to issue of permit. Display Building Permit onsite. f) Supply and Installation of new H20 load rated safety rail. g) Ensure the compliance with Building Code (BCBC 2024), WorkSafe BC regulations. h) Tidy up and make good any disturbances to ground or structure on public or private property. 4.2 Salt Spring Island Multi Space Facility (in conjunction with item 4.1 above): a) Identify, record and follow all relevant specification, regulation and codes of practice for the following: b) Investigate, design and construct a new permanent access ladder assembly with adequate bracing and top of roof guardrails. c) Design a suitable and safe roof access assembly to Second-floor level integrating with the current roof of firstfloor by creating a platform for the ladder to rest on first floor level and connecting the far end of ladder to second-floor level roof guardrails. d) Submit design and/or drawings to CRD for review and approval. e) Apply for Building Permit; submit design and drawings to CRD SSI Building Inspection Team, fees, attend to any follow up building permit requirements provide correspondence and documentation as required to issue of permit. Display Building Permit onsite. f) Supply and Install Ladder assembly for existing roof ladder and Guardrails around the ladder roof area on second floor level according to Building Code (BCBC 2024) and latest OHS Standards and regulations. g) Provide all required scaffolding necessary to perform work. Erect scaffolding independent of walls. Construct, maintain and use scaffolding in accordance with CAN/CSA-S269.2M. h) Provide all required hoisting equipment for removal of existing structure and placing of materials and equipment during construction. i) Ensure compliance with all the regulations regarding welding and cutting or any operations that generate sparks, flames, smoke and heat. j) Tidy up and make good any disturbances to ground or structure on public or private property. Documents can be obtained from www.crd.bc.ca/about/contracts-rfps/ and www.bcbid.gov.bc.ca

Sub-Bidding

Water / Sewer

$500,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
70
Bidding Soon
1,907
All Active Projects
777
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

January 6, 2025

img_map_placeholder

Multiple Locations, Victoria, BC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.