BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work and paving for a bridge / tunnel in Fort Wayne, Indiana. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project Control No. 2002141, 2002142 Federal/State No. 2002141, 2002142 Location Bridge Deck Overlay I469-29-07217 Continuous Composite Plate Girder Allen County - on I-469e Over Maplecrest Road, 3.99 Miles West of Sr 37 (Rp 028+0057) Bridge Deck Overlay I469-29-07217 Continuous Composite Plate Girder Allen County - on I-469w Over Maplecrest Road, 3.99 Miles West of Sr 37 (Rp 028+0057) DBE Goal: 9 Completion Date September 26, 2026 Qualifications: D(B) E(C) An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Engineer by the time set for receipt of proposal bids. INDOT - Call 531- Small Structure Replacement - SR 159

Award

Bridges / Tunnels

$4,877,740.00

Public - State/Provincial

Paving, Site Work

101

10

2

9

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
78
Bidding Soon
1,238
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

December 16, 2024

Project location map

I-469, Fort Wayne, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.