EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 31, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a fire / police facility in New Milford, Connecticut. Completed plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

The project goal is to a select a contractor who has a proven construction track record to build a finished structure which meets the requirements of an essential services building and functional fire station. in the Town of New Milford. Question Submission Deadline January 3, 2025, 8:00am Question Response Deadline: January 9, 2025, 5:00pm This project includes renovating the approximately 5,940 square feet existing fire station, expanding it by approximately 8,250 square feet. When complete, the building should represent a finished structure and meet the requirements of an essential services building. The Town desires a metal building with a life span of more than twenty (20) years, constructed of materials that present a pleasing appearance yet require low levels of maintenance, and afford reasonable security for the occupants and the property contained therein. The contractor shall include a 20 year warranty.

Award

Fire / Police

$3,515,042.00

Public - City

Addition, Demolition, Renovation, Site Work

14

3

22

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
557
Active Projects
330
Bidding Soon
4,762
All Active Projects
2,169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

September 16, 2025

img_map_placeholder

2 Lanesville Rd, New Milford, CT

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Lanesville Fire Station Addition and Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.