BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2025 at 7:00 PM

Updated January 22, 2025

Site work and new construction of a medical facility in Cass Lake, Minnesota. Completed plans call for the construction of a medical facility; and for site work for a medical facility.

As of January 21, 2025, project was awarded to Kraus Anderson, but awarded amount is not available. Leech Lake Wellness Centers. Question Deadline 11/07/2024 Any questions regarding this RFP must be submitted by email only, to Darold Madigan at the email address above by. A written response to received questions from participating CM will be sent out no later than Friday November 15th. Description: 3 Community/Wellness Centers A new Wellness Center of approximately 55,000 SF which generally includes: a. 2-3 Station gymnasium with walking track above b. Natatorium with pools, spa, and outdoor splash pad c. Locker Rooms d. Fitness and Studio Areas e. Community Spaces f. Wellness / Clinic Space g. Administrative and Support areas 2. New Clinic/Wellness Center approximately 20,000 SF 3. Addition/Remodel Kego Lake Center with a half court gym approximately 5,400 SF 4. Site and utility work associated with the new construction; 5. The owner will be responsible for FF&E Scope of Work - Pre Construction. The scope of work for CM shall be stated in the contract documents, but at a minimum the selected CM will be expected to begin preconstruction services on the project immediately and will be working very closely with the Leech Lake Band of Ojibwe ("Owner") and the Owner's architects and engineers, and the Owner's Representative. The Pre-Construction services shall consist of: a. CM will be required to prepare a Guaranteed Maximum Price ("GMP") contract amendments based on the following Construction Documents provided by the architectural / engineering team: o Cass Lake site - 100% Construction Documents (Available within 30 days of Award) o Ball Club sit - 80% Construction Documents (Available within 30 days of Award) o Kego Lake site - 80% Construction Documents (Available within 30 days of Award)

Award

Medical

$500,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
8
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2024

December 23, 2024

Project location map

Multiple Locations, Cass Lake, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.