BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2024 at 7:00 PM

Updated April 2, 2025

Demolition, site work, paving, outdoor lighting and renovation of a mixed-use development in Minocqua, Wisconsin. Completed plans call for the demolition of a warehouse / distribution facility; for the renovation of a warehouse / distribution facility; for site work for a warehouse / distribution facility; for outdoor lighting for a warehouse / distribution facility; water / sewer project; water / sewer project; and water / sewer project.

Lakeland Sanitary District WWTF Upgrade Description: The Project includes the following Work: construction of new effluent pump station; ATAD complex; biofilter; grit collector, scum pump station; anaerobic/anoxic selector basin; floating mixers; recycle pump; sidestream pump station; RV dump station; debris drying bed; chemical feed systems and storage; thickening and dewatering equipment; sludge mixing; sludge storage tank improvements; pumps; blowers; generators; sampler; modifications to Pump & Control Building, Administration Building, Aerated Grit Removal, Equalization Basins, Scum Pump Station; Final Clarifier and Garage Building; Sludge Storage Complex, Biosolids Processing Building, ATAD, Exhaust Air Bed, Sludge Drying Bed, Storage Building; equipment demolition; tank cleaning and content removal; tree removal, site grading, site lighting improvements, erosion control, painting, valves, piping, improvements including paving, plumbing, HVAC, and electrical, instrumentation & controls, and upgrades to the SCADA system. The anticipated substantial completion date is December 15, 2026, and final completion date is June 30, 2027. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. This project anticipates use of Wisconsin DNR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), Women's Business Enterprises (WBEs), and Small Businesses in Rural Areas (SBRAs) to submit bid proposals. A municipality, in awarding prime contracts, and primary contractor, in awarding subcontracts, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. Owner reserves the right to waive any informalities or to reject any or all bids.

Award

Water / Sewer

$21,544,368.00

Public - City

Demolition, Outdoor Lighting, Paving, Renovation, Site Work

342

36

419

13

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
5
Bidding Soon
195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 14, 2024

Project location map

8780 Morgan Rd, Minocqua, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.