Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Dallas, Texas. Completed plans call for the renovation of a educational facility.
No further information will be officially released until after the date the Agenda is publicized for the Board of Trustees briefing. The right is reserved to reject any or all bids, proposals, CSPs or statements of qualification and to waive technicalities. The Dallas Independent School District is committed to the ideals of equal opportunity in all its business endeavors. The Dallas Independent School District's Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal. Question Deadline 11/08/2024 Technical questions and all other questions related to this solicitation are to be referred to: Attention: Dallas ISD Procurement Services Email:ProcurementCS@dallasisd.org. Please notate the solicitation number CSP 207706 in the subject line of your email. Project consists of the following: 1. Provide secure front vestibule by adding a storefront system corridor. 2. Provide infrastructure for card readers, door contacts, door releases, and cameras as required for secure vestibule. 3. Provide door hardware as required to add security system. 4. Replace approximately 400 sf of misaligned VCT in corridor. 5. Replace sealants in exterior joints around windows and in masonry joints. 6. Replace Marquee sign. 7. Remove cooling tower and upgrade water-cooled AC system with new air-cooled chiller and chilled water pump, including piping, valves, pumps, ventilators, circuits, and new controls throughout school. 8. Replace mini-split AC units in MDF/IDF rooms. 9. Replace selected drinking fountains and add bottle-fillers. 10. Replace back-flow prevention/RPZ valve. 11. Replace grease-trap and grease-trap piping throughout kitchen and from grease-trap out to city sewer tie-in. 12. Replace exterior soffit and wall-pack lighting fixtures, and heads on pole-lights, with LED fixtures. 13. Replace exterior lighting controls. 14. Replace Fire-Alarm system. 15. Repair atrium windows and sealants. 16. Add Alternate: Replace the school-wide PA system. 17. Add Alternate: Provide mild-detergent power-wash on selected areas of exterior. ORG 264 - RONALD E. McNAIR ELEMENTARY SCHOOL - RENOVATION: Project consists of the following: 1. Provide secure front vestibule by adding a storefront system across lobby. 2. Provide infrastructure for card readers, door contacts, door releases, and cameras as required for secure vestibule. 3. Provide door hardware as required to add security system. 4. Install new door from new secure vestibule into reception/administration office. 5. Replace existing casework and reception furniture with new reception counter and work-station casework. 6. Replace damaged hollow-metal doors and hardware, and repair hollow-metal frames. 7. Replace sealants in exterior joints around windows and in masonry joints. 8. Replace single-ply roofing system. 9. Replace asphalt-shingle roofing system. 10. Replace air-cooled chillers, packaged mechanical units, AHUs, mini-splits, and controls. 11. Replace selected drinking fountains and add bottle-fillers. 18. Replace grease-waste piping. 12. Replace back-flow prevention/RPZ valve. 13. Replace exterior soffit and wall-pack lighting fixtures, and heads on pole-lights, with LED fixtures. 14. Add new pole lights. 15. Replace exterior lighting controls. 16. Replace Fire-Alarm system 17. Repair selected areas of damaged concrete sidewalks. 18. Provide mild-detergent power-wash on selected areas of exterior. 19. Add Alternate: Replace marquee sign. 20. Add Alternate: Replace operable panels separating auditorium and gymnasium. 21. Add Alternate: Replace VCT in gymnasium with pourable athletic flooring and striping. The Dallas Independent School District’s Construction Services projects have a 30% Minority and Women-Owned Business Enterprise (M/WBE) construction goal.
GC Bidding
Educational
$7,479,756.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 3, 2024
February 3, 2025
Multiple Locations, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Nov 18 2024
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Oct 30 2024
Dallas, TX
Bid Date: Dec 04 2024
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Dec 10 2024
Dallas, TX
Bid Date: Nov 01 2024
Dallas, TX
Bid Date: Nov 19 2024
Dallas, TX
Bid Date: Nov 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.