Published January 5, 2025 at 7:00 PM

Updated January 6, 2025

Renovation of a mixed-use development in Danville, Illinois. Completed plans call for the renovation of a medical facility.

Project no - 550-24-103, 550-25-1-6969-0001 Replace Air Handler Units B98 CON Project 550-24-103 Replace Air Handler Units B98 at VA Illiana Health Care System, Danville, IL Contractor shall furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract, in accordance with specifications & drawings to complete Project 550-24-103 Replace Air Handler Units B98 at the VA Illiana Health Care System, Danville, IL 61832. All work shall be completed within three hundred sixty-five (365) calendar days after issuance of the Notice to Proceed. (NTP) The project magnitude range is between Between $1,000,000 and $2,000,000. NAICS Code is 236220, Commercial and Institutional Building Construction / SBA Size Standard: $45M This procurement is a 100% set-aside for CVE Verified Service-Disabled Veteran-Owned Small Business Firms (SDVOSB) per The authority 38 U.S.C 8127 (Public Law 109-461). In accordance with VAAR 819.7003(b), at the time of the submission of Bid, and prior to award of any contract, the bidder must represent to the CO that it is: (1) a SDVOSB eligible under VAAR Subpart 819-70: (2) a Small Business concern under the NAICS assigned to this acquisition; and (3) a SDVOSB listed as verified in the SBA VIP database at: https://veterans.certify.sba.gov/ Submit all questions regarding the solicitation, specifications, and/or drawings in writing to the Primary POC: Thomas Stevens - Contracting Officer, no later than 12:00PM local time on November 04, 2024 Questions received after this deadline may not be addressed. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED! See 52.236-27 Site Visit for information on organized site visits: One site visit is scheduled October 28, 2024 from 2:00 - 3:00 PM Local Time. Meet at Bldg. 102 at the VA Illiana Health Care System, Danville, IL 61832. NOTICE: Contractors MUST acknowledge VAAR 852.219-75 by signing the certification and submitting with bid/proposal. If certification is not included, bid/proposal will be considered non-responsive and cannot be considered for award. See page 53-54 for 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services & Construction (JAN 2023)(Deviation). If submitting as a joint-venture, officers must include a copy of the joint-venture agreement. All bidders are responsible for monitoring and downloading any amendments from Contract Opportunities at the following website: https://sam.gov/content/opportunities *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$1,950,000.00

Public - Federal

Renovation

38

20

15

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Project Record Documents, Spare Parts, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Finish Carpentry, Millwork, Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Windows, Roof Windows and Skylights, Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Gypsum Board, Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Curtains, Air Terminal Units, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Transfer Switches, Automatic Transfer Switches, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Structured Cabling, Communications Horizontal Cabling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Earthwork Methods, Slope Protection, Containment Barriers, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Derricks, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
46
Bidding Soon
700
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

February 3, 2025

img_map_placeholder

1900 E Main St, Danville, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.