Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 6, 2025 at 7:00 PM
Updated January 7, 2025
Site work for a water / sewer project in Smithville, Missouri. Completed plans call for site work for a water / sewer project.
**As of January 6, 2025 project was awarded to Multiple Contractors, Clean Infusion,LLC -$29,633 JCI Industries, Inc.-$21,002 Rand Construction Company-$48,885 with the total of $99,520** This document constitutes an Invitation For Bids from prospective Vendors in regard to Sewerage Pump Installation, Replacement, Repair, and Maintenance Services for Clay County, Missouri Parks, Recreation and Historic Sites in accordance with the requirements and provisions stated therein. Question Deadline 11/04/2024 Questions and issues relating to the IFB must be submitted via Onine website or emailed to Purchasing@ClayCountyMo.gov In order for a Bid to be considered complete, the Clay County document(s) must be completed in their entirety. The cover page MUST be completed, all pages MUST be initialed and the Terms and Conditions Acknowledgement Form MUST be signed. Additionally, all Addendums, Exhibits and Supplementary Documents, as required, MUST be acknowledged, signed and submitted with all Bid documents, as well. This section of the IFB includes requirements as well as desirable attributes and provisions relating specifically to the scope of work requirements of Clay County. The contents of this section include mandatory requirements that will be required of the successful vendor and subsequent vendor. The vendor is requested to provide responses to the requirements/desired attributes in this section pursuant to the directions identified herein. The vendors response, whether responding to a mandatory requirement or a desired attribute, shall be binding in the event the bid is accepted by Clay County. The vendor must provide all costs necessary to meet the mandatory requirements and the fulfillment of any desirable attributes by the vendor (if any) in the appropriate sections of Exhibit A, Pricing Pages. The Vendor must provide Sewerage Pump Installation, Replacement, Repair and Maintenance Services for the Clay County Park Department and pumping stations and for lift stations and equipment throughout the Clay County Parks Department including but not limited to; the replacement of the secondary pump in the lift station located at Little Platte Park, 1
Award
Water / Sewer
$99,520.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2024
December 16, 2024
NE 176th St, Smithville, MO
Related To This Project
Smithville, MO
Bid Date: Nov 01 2024
Smithville, MO
Bid Date: Feb 25 2025
Smithville, MO
Bid Date: Feb 25 2025
Smithville, MO
Bid Date: Feb 18 2025
Smithville, MO
Bid Date: Mar 12 2025
Smithville, MO
Bid Date: Mar 25 2025
Smithville, MO
Bid Date: Mar 25 2025
Smithville, MO
Bid Date: Apr 22 2025
Smithville, MO
Bid Date: Nov 06 2024
Smithville, MO
--
Smithville, MO
--
Smithville, MO
Bid Date: Aug 27 2024
Smithville, MO
--
Smithville, MO
--
Smithville, MO
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
