BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a pipeline in Escondido, California. Completed plans call for site work for a pipeline.

As of April 17, 2026, the project was awarded to JW Fowler - James W. Fowler Co., with an awarded amount of $30,472,539.85. Reference Number 0000411593 The Work generally consists of relining an existing untreated water 96-inch inside diameter prestressed concrete cylinder pipe by fabricating, setting, and welding approximately 4,968 feet of 93-inch outside diameter welded collapsible steel liners; installing approximately 96 feet of 93-inch outside diameter cement mortar lined welded steel pipe closure pieces at two portals; grouting annular space behind installed steel liners; field applying cement mortar lining to the interior of installed steel liners, installing three temporary portals to access the existing 96-inch pipe; providing excavation support systems; installing, maintaining and removing temporary fencing; installing soundwalls; cutting, demolishing and disposing prestressed concrete cylinder pipe; and removal of abandoned acoustic fiber optic cable from existing pipe; clearing and grubbing; dewatering; providing traffic control; installing, maintaining, and removing environmental fencing and flagging; installing and maintaining storm water pollution prevention measures; excavating and backfilling; installing a concrete isolation structure; rehabilitating eight pipeline structures; removing and salvaging existing valves and piping components; demolition and disposal of concrete structure and pipeline encasement; installing cathodic protection test stations; placing reinforcing steel and encasing welded steel pipe in concrete; installing welded steel pipe bulkheads; restoring the site including placement of soil amendments and hydroseeding; restoring and improving existing access roads along reline segment; providing record documents; and all other appurtenant work as required by the Contract Documents. Location of Work: The Project site is located in the northern part of San Diego County along the Water 5. Authority's Second Aqueduct. The reline, isolation structure, and valve structure rehabilitation portion of the Project is west of Interstate 15, north of the Oceanside 5 Flow Control Facility, and spans south across Jackass Canyon to Huckleberry Lane. The isolation structure is located in the vicinity of the North County Distribution Pipeline Flow Regulatory Structure at 3775 Silverleaf Lane, Vista, California 92084. See the Plans for the vicinity and location maps of the Work. Access to the site is limited to public streets, temporary right-of-entry easements, private roads identified on the Plans, and Water Authority rights of way. Job Location The Project site is located in the northern part of San Diego County along the Water Authority's Second Aqueduct. Question Deadline 03/16/2026 All questions relative to this Project prior to the opening of bids shall be emailed to Mike Vanoli, Assistant Management Analyst, at mvanoli@sdcwa.org.

Award

Pipeline

$30,472,540.00

Public - County

Site Work

110

20

23

7

Subscribe For Documents

129 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
609
Active Projects
292
Bidding Soon
3,776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

September 1, 2026

Project location map

Huckleberry Ln, Escondido, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.