BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Henderson, Nevada. Completed plans call for the renovation of a three-story above grade fire / police facility.

The City of Henderson, Nevada, is soliciting responses from qualified construction managers/general contractors for the performance of Construction Manager at Risk ("CMAR") services for the Emergency Services Facility Renovation ("Project"), located at 223 Lead St. The 3-story building was originally constructed in 1991 with renovations performed in 1997 and 2014. Functionally, the building serves as the headquarters for the Henderson Police Department, downtown area patrol substation, 911 emergency dispatch call center, and public customer service operations. An assessment of the building uses identified the need for additional building area, reconfiguration of various functional spaces, general floor/wall finish replacements, and replacement of above-ceiling HVAC components. For budgetary and operational logistics, work scope shall be phased to allow continuous occupancy during renovations. Pre-construction services shall include active participation in the design process including constructability reviews; construction cost estimates at 90% and 100%; system and unit price costing for subcategories of work; advice; project analysis and feedback regarding materials, methods, systems. Services also include schedule development, descriptions of long lead time items, analysis and expertise relating to labor and other conditions affecting construction and subcontractor selection for development and construction of the Project. CMAR to assist in all ways possible to achieve the project goals. At the completion of design, the CMAR shall follow Nevada Revised Statute (NRS) requirements for delivering a Guaranteed Maximum Price. The construction estimate range for the first phase is $3,000,000-$6,000,000 with future-phase budgets to be determined. Nevada State Prevailing Wage Rates will apply. Question Deadline 11/05/2024 at 12:00 PM PT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Fire / Police

$6,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
11
Bidding Soon
403
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

July 14, 2025

img_map_placeholder

223 Lead St, Henderson, NV

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.