Site work and renovation of a mixed-use development in Texas City, Texas. Completed plans call for site work for a 1,408-square-foot, one-story above grade water / sewer project; and for the renovation of a municipal facility.

1. Concrete fishing pier in its entirety has been awarded. (Drive concrete pile, CIP caps, CIP diaphragms, CIP notch's, CIP bollards, CIP Decking, Install expansion joints covers, install timber decking and rail) 2. Dunes and site have been damaged by Hurrican Beryl. GLO/County/Fema working on restoring site to pre-hurricane conditions. 3. Installation of Waterline and sewerline on Concrete pier to be included in this contract. Precast inserts can be installed in the Concrete beams prior to casting. Concrete beams have not been cast yet. 4. Property to the East of the site will be used a laydown yard 5. Starting time for this portion of will be varying for all diciplines. 6. Metal building to be installed on the Concrete pier decking. Anchor bolts will need to be installed prior to pouring the concrete decking. 7. Sign footing and condensor pad design will be provided by owner, plans state to be designed by contractor. 8. Bollards to be embedded 5' in ground 9. 2" waterline extended to the vendor pad site. 1-1/2" service to lawn is to be terminate at spigot. 10. Electronic documents from engineer avalaible upon award 11. Attenuator at western side of Hwy 87 to be relocated by others 12. Sewer forcemain to be installed by Udine onto site 13. Ideally to award all items to one contractor but can break into diciplines if required It may be determined that clarifications or interpretations of the Contract Documents are necessary. Upon direction by ODR, such clarifications or interpretations will be provided by A/E consistent with the intent of the Contract Documents. A/E will issue these clarifications with reasonable promptness to Contractor as A/E's supplemental instruction ("ASI") or similar instrument. If Contractor believes that such clarification or interpretation justifies an adjustment in the Contract Sum or the Contract Time, Contractor shall so notify Owner in accordance with the provisions of Article 11.

Post-Bid

Municipal

$3,458,000.00

Public - State/Provincial

Renovation, Site Work

105

27

5

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
52
Bidding Soon
2,615
All Active Projects
1,008
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

January 21, 2025

img_map_placeholder

Multiple Locations, Texas City, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.