BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Bowling Green, Kentucky. Conceptual plans call for the demolition of a 156,854-square-foot educational facility; for the construction of a educational facility; and for site work for a educational facility.

Company Contact WKU Planning Design and Construction Doris Hayes Location Bowling Green, Kentucky Introduction: Western Kentucky University's Planning, Design, and Construction (PDC) department is requesting a proposal to provide professional services related to the WKU 2026-2032 Capital Plan submission. The architectural firm will assist in documentation for the submission of the replacement of the Ivan Wilson Fine Arts Center. The existing building, constructed in 1973, includes 156,854 gross square feet under roof. This project would consist of a new building and the demolition of the existing building. This project is WKU's number one project for WKU's 2026-2032 Capital Plan submission. The selected firm will assist in completing the required information for the SYP-2 form, which includes project scope, program planning, and cost estimates. A sample of this form is included as a separate attachment for reference. Project Expectations: The team will work closely with Planning Design and Construction's project manager in collaboration with the Dean of the College of Fine Arts and other university stakeholders to develop programming needs for a new facility. Additionally, other programs outside the current Fine Arts building could be integrated into the planning for this project. The firm will put together a team of professionals needed to assist WKU in filling out the SYP-2 form for the Capital Plan submission. Additional services, including a preliminary floor plan and renderings for the new facility may be needed for justification of project. Scope of Services and Project Deliverables: 1. Project Programming & Stakeholder Engagement: o Collaborate with key stakeholders to determine current and future programming needs for the new Fine Arts Center. o Assess whether other programs should be included in the new facility. o Provide space and program requirements for the new building that align with WKU's strategic goals and objectives. o Feasibility study and programmatic assessments. 2. SYP-2 Form Assistance: o Develop and provide all necessary documentation and data required to complete the SYP-2 form for the replacement of Ivan Wilson Fine Arts Center for the 2026-2032 Capital Plan submission. o Generate cost estimates, square footage requirements, operational cost, and phasing information necessary for the SYP-2 form. o Provide summaries, project scope, and financial needs. 3. Optional Services (floor plan): o Provide preliminary floor plan options based on the proposed program requirements. 4. Optional Services (renderings): o Provide a Rendering for the future FAC 5. Optional Services (schematic design): o Provide further schematic design development. 6. Optional Services (site review): o Review potential sites based on size of facility needs Proposal Requirements: Interested firms should submit a proposal that includes: 1. Firm Qualifications & Experience: o Provide experience in writing feasibility studies as it relates to state funding. o Listing of key personnel who will be assigned to the project. 2. Project Approach: o A description of how the firm will approach stakeholder engagement, program development. o A clear process for providing baseline cost estimates, programming, and preliminary design documents. 3. Schedule & Timeline: o A proposed timeline for completing the required services, including milestone deliverables for programming, SYP-2 form submission, and preliminary design. Description Dates Kick off Meeting November 11, 2024 Collaboration with programs November 18-December 6 First draft Jan 3, 2025 WKU review Jan 3-Jan 10 Final document for submission Feb 1, 2025 Additional/optional documents March 30 2025 4. Fee Structure: o A detailed fee proposal, including a breakdown of costs for the baseline SYP-2 form submission and the additional services noted as optional in the Scope of Services and Project Deliverables section. The proposal should include hourly rates for additional services needed. Selection Process: Proposals will be evaluated based on the firm's experience, approach to the project, and proposed fee structure. WKU reserves the right to select based on the best interest of the University. Scope of services may also change based on funds available or additional needs of the university The selection process will follow KRS 45A.825(7) Selection Without Interviews. Questions: regarding this RFP must be received in the Unimarket System before 2:30 p.m. through the business day of Monday, October 28, 2024 Contact Info for Unimarket for issues or questions about the site. Unimarket support: o 888.868.5929 o support@unimarket.com Project Contact Information: Kerra Ogden Capital Project Manager Western Kentucky University - Planning, Design, and Construction kerra.ogden@wku.edu 270-745-2128 Contact Name Marci Morehead Organization (WKU_ORG) Western Kentucky University Contact Email marci.morehead@wku.edu Existing plan holders will be notified by email upon the release of any addenda and links will be available below for downloading/viewing. Failure to order bid sets through Lynn Imaging and not being on the plan holders list will prevent you from receiving the notification and being able to view the addenda.

Conceptual

Educational

$2,370,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
15
Bidding Soon
704
All Active Projects
271
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2024

July 3, 2025

img_map_placeholder

Colonnade Dr, Bowling Green, KY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.