Site work and paving for a bridge / tunnel in Beaver, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Counties: Beaver Calendar Days: 180 Calendar Days Bridge Rehabilitation Us-270: Over Kiowa Creek, 15.2 West of the Us-270 and Us-283 Intersection Near Slapout. Project Length = 0.162 Miles DBE Goal: - Question Deadline 11/01/2024 - Please submit your questions through the ODOT pre-bid email address: ODOT-Prebid.Question@odot.org. Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5 % of the bid total. OKDOT - 600 - Bridge Rehabilitation - US-270 This work consists of structural strengthening using Fiber-Reinforced Polymer (FRP) composite wrap. Fiber may be either Carbon (CFRP) or E-Glass (EGFRP) as specified in the plans. Reference is made to ACI 440.2R-02 Guide for the Design and Construction of Externally Bonded FRP Systems for Strengthening Concrete Structures. Migratory Birds are protected by the Federal Migratory Bird Treaty Act. These species commonly use the vertical faces of bridges and culverts for nesting. Once Migratory Birds have nested in a bridge, they will return every year with their young to nest again. If Migratory Birds are allowed to build nests on the bridge, construction activities which disturb the nests or prevent the parent birds from feeding the young will be prohibited until the young birds are out of the nests. The nesting season for these species runs from March 1 to August 31. Measures used to prevent the birds from establishing nest in the bridges and culverts will have to be completed prior to the start of the migratory birds nesting season. In the event the Contractor fails to prevent nesting of migratory birds, the Engineer may suspend work until the end of the nesting season. Time charges will continue during this work suspension if the nesting occurred due to the negligence or inattentiveness of the Contractor in installing the nest prevention measures. This work consist of furnishing portable traffic signal systems as shown on the Plans, or as required by the Engineer.

Award

Bridges / Tunnels

$1,478,340.00

Public - State/Provincial

Paving, Site Work

27

8

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
30
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

April 7, 2025

img_map_placeholder

US-270, Beaver, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.